Skip to content

Lifecycle management in VCF 9.1: depots, images and upgrade order

Lifecycle work in VMware Cloud Foundation 9.1 runs through VCF Operations, and while an upgrade or patch operation is in progress, no other component can be upgraded or patched1. In domains that share an NSX instance, NSX, vCenter and ESX are upgraded in all of them, and canceling the automatically created plan of one dependent domain cancels it for every domain on that NSX instance2. The baseline is VCF 9.1.1 with its October 12, 2026, patches.

The 9.1.1 builds to pin

Patch releases in the 9.1.1 line are not synchronized, Broadcom lets administrators pick them by impact3, and the 9.1.1 release notes ask for the latest binaries4. The targets, all of October 12, 2026, unless noted, are356789:

  • Fleet lifecycle, SDDC lifecycle and software depot 9.1.1.0200, builds 25801070, 25801981 and 25801072.
  • SDDC Manager 9.1.1.0200, build 25801071.
  • VCF Operations 9.1.1.0100, build 25795063, with its cloud proxy and license server.
  • VCF services runtime, identity broker and Salt RaaS 9.1.1.0100, builds 25801571, 25796677 and 25795075.
  • VCF Automation and migration service engine 9.1.1.0200, build 25801570, and VCF Operations orchestrator 9.1.1.0100, build 25795101.
  • NSX 9.1.1.0100, build 25762940, vCenter 9.1.1.0100, build 25784172, and ESX 9.1.1.0100, build 25782009.
  • vSAN File Services 9.1.1.0200, build 25846901, of October 26, 2026.

The VCF Operations release notes give the cloud proxy build 25795064 and the license server build 25795080, both patched automatically with VCF Operations10, while the patch index lists 25795063 for both3. Our recommendation is to record the builds the appliances report. vCenter 9.1.1.0200 of November 19, 2026, build 25901347, is a separate, optional security patch for one CVE, published as VMSA-2026-0009, applied through VCF Operations11. Our recommendation is to take it only after a fresh Interoperability Matrix check and change approval.

VCF Automation and VCF Operations orchestrator have to match up to the subminor digit, both 9.1.0.x or both 9.1.1.x, because in 9.1.1 the orchestrator’s API calls need a token scope added in that release12. Our recommendation is to move both across that boundary in one change.

Choosing the target and the timing

Broadcom’s post of October 13, 2026, ends general support for vSphere 8.0 and VCF 5.x on October 11, 2027, and for 9.0 on September 17, 2027, and says 9.1.1 extends it to August 202813. The Product Lifecycle listing shows November 12, 2027, as end of service for 9.0.0 to 9.0.214. Our recommendation is to plan the exit from 9.0 against the earlier date.

The 9.1.1 release notes cover upgrades from VCF 5.2.x and 9.0.x, which start with VCF Operations, and patches from 9.1.0.x4. An upgrade can go straight to 9.1.1 without stopping at 9.1.015. For VCF 5.2.1, the SDDC Manager release notes ask for 5.2.2 or 5.2.3 first5, while the Interoperability Matrix upgrade view lists the direct jump16. A route through 5.2.3 meets both, as VCF 5.2 to 9.1.1 upgrade planning sets out.

The target must have been released after the current version, for every component in the source BOM, and a patch release is in general a valid target only if its parent maintenance release is one15. Broadcom’s October post adds that a future out-of-band patch could bring back the “back-in-time” restriction that 9.1.1 lifted13. The VCF 9.1 Upgrade Planning Tool of May 28, 2026, splits a route into phases for maintenance windows17.

Binaries, the depot and cluster images

No deployment, upgrade or patch starts until its binaries are available through the software depot2. Where latency from the fleet-level depot on the first VCF Instance exceeds 150 ms, a secondary depot can run locally18. After an upgrade from 5.2 or 9.0.x, the depot has to be configured before it serves anything19.

Figure 1 compares the connection modes, chosen under Build > Software Depot. Connected mode pulls binaries with hardware compatibility, interoperability and lifecycle metadata, through no proxy or one without Kerberos or NTLMv2 authentication, after the depot ID is registered in the VCF Business Services console. Offline Depot mode forwards requests to your own web server, filled by the VCF Download Tool, without a local copy, so that server must be up for every upgrade. Disconnected mode takes uploads from a connected machine running the tool19. From 9.1.1 an offline depot can also host artifacts, and third-party ESX binaries need extra steps in connected mode18.

Connected
Offline Depot
Disconnected
Binaries come from
Connected: The internet, directly or through a proxy without Kerberos or NTLMv2 authentication
Offline Depot: A web server you own, filled with the VCF Download Tool
Disconnected: Uploads, after the VCF Download Tool runs on a machine with internet access
Depot holds
Connected: Binaries plus hardware compatibility, interoperability and lifecycle metadata
Offline Depot: No local copy. From 9.1.1 the server can also host artifacts
Disconnected: The binaries uploaded to it
All modes
Set under Build > Software Depot. No deployment, upgrade or patch starts until its binaries are available through the depot
Figure 1. The three software depot connection modes in VCF 9.1, compared.

From VCF 9.0 on, only vSphere Lifecycle Manager image clusters are supported20. A cluster still on baselines must be transitioned before its hosts move to ESX 9.0 or later, and where SDDC Manager manages the cluster only its supported mechanisms may do that, a PowerShell script or the SDDC Manager API21. The exception is a truly heterogeneous cluster: under KB 424294, cited by the ESX procedure20, vCenter Update Manager may take it to ESX 9 and it moves to images right after, since heterogeneous images need ESX 9.

An imported image’s ESX version has to match the domain plan’s target: the VCF BOM version20, or a patch build set as a custom target version (KB 453592). A cluster with mixed hardware can carry up to four additional image definitions on one fixed base ESX version, each with its own vendor add-on, firmware and components22. A workload domain on vSAN needs its image in the VCF image library before creation, and if the management domain hosts carry an express patch, hosts of a new domain need the same one23. Storage software and drivers outside vSAN remain a manual task, checked against the vSphere HCL and the storage vendor20.

Upgrade order from 9.0.x and 5.2.x

Major and minor releases require a strict order2. An upgrade to 9.1 begins with the VCF Instance that hosts VCF Operations, whose fleet-level components and management domain reach 9.1.x first. The management domains of the other instances follow, and a workload domain can be upgraded at any time after its own instance’s management domain15.

From 9.0.x the order, drawn in Figure 2, is VCF Operations with its cloud proxy, then vSphere Replication, VMware Live Site Recovery, vSAN Data Protection and Avi Load Balancer, SDDC Manager, the new management services and license server, the remaining management components (identity broker, VCF Automation, VCF Operations orchestrator, VCF Operations for networks and for logs, HCX, Data Services Manager) and, where NSX is federated, the NSX Global Manager before NSX Manager. The domain steps end with Data Services Manager databases, VMware Tools, virtual machine compatibility, the vSAN on-disk format and vSAN File Service. The vCenter, vSphere Kubernetes Service and Supervisor steps can take several hops by version, which the VKS Upgrade Planner lists. The 9.0 fleet management appliance is decommissioned rather than upgraded, its work taken over by fleet lifecycle and SDDC lifecycle in the management services1524, and left powered down for removal (KB 440630).

An identity broker appliance on an NSX overlay segment, or on another network or datastore than VCF management services, has to be redeployed before VCF Operations is upgraded, and if VCF Operations is already on 9.1.x, KB 444734 replaces that procedure25. An appliance on the same network and datastore is upgraded with the management components, and an embedded broker with vCenter1525. A VCF Automation appliance off the primary datastore of the primary cluster can be upgraded only to 9.1.1.0200 or later, and only with fleet lifecycle, SDDC lifecycle and SDDC Manager at 9.1.1.02009. From 5.2.x the upgrade starts with Aria Operations and its cloud proxy, and Aria Suite Lifecycle has no upgrade to 9.115.

Upgrade order from VCF 9.0.x to 9.1Redeploy an appliance Identity Broker before Operations if it is on an NSX overlay or differs from management services in network or datastore. If Operations is already on 9.1.x, use KB 444734 instead. The sequence starts with Operations and cloud proxy, then the named protection, recovery and load-balancing products, SDDC Manager, new management services and license server, remaining management components, and Global Manager for federated NSX only. The per-domain container states instance ordering and shared NSX requirements. Within each domain, NSX Manager and vCenter precede conditional Kubernetes Service and Supervisor, then image-based ESX. Stretched-cluster witness conditions accompany ESX. After ESX, in sequence: the NSX Edge clusters, NSX finalize and the vSphere Distributed Switch. Finishing tasks complete the domain stages.VCF 9.0.x to 9.1Identity Broker applianceIf on NSX overlay, or differentnetwork or datastore fromVCF management services:Redeploy before OperationsIf Operationson 9.1.x:KB 444734 instead1VCF Operationsand cloud proxyStart: Operations-hosting instance9.0 fleet appliance:decommission,not upgrade2Protection, recovery, load balancingvSphere ReplicationVMware Live Site RecoveryvSAN Data ProtectionAvi Load Balancer3SDDC Manager4New VCF management servicesand license server5Remaining management componentsVCF Identity Broker applianceSame network and datastoreas VCF management servicesVCF AutomationVCF Operations orchestratorVCF Operations for networksVCF Operations for logsVCF Operations HCXData Services Manager6NSX Global ManagerFederated NSX onlyPer domain, in orderFirst to 9.1.x: Operations-hostinginstance’s fleet componentsand management domainThen: other instances’ management domainsEach workload domain: after its ownmanagement domainShared NSX: NSX, vCenter and ESXin every sharing domain7NSX Managerand vCenterEmbedded broker:with vCenter8Workload Managementenabled onlyvSphere Kubernetes ServiceSupervisor9ESXImage clusters onlyStretched clusterPhysical witness:manually beforeESX hostsVirtual witness:in cluster workflow10After ESXNSX EdgeclustersNSX finalizevSphere Distributed Switch11Finishing tasksData Services ManagerdatabasesVMware ToolsVirtual machine compatibilityvSAN on-disk formatvSAN File Service Upgrade order from VCF 9.0.x to 9.1Redeploy an appliance Identity Broker before Operations if it is on an NSX overlay or differs from management services in network or datastore. If Operations is already on 9.1.x, use KB 444734 instead. The sequence starts with Operations and cloud proxy, then the named protection, recovery and load-balancing products, SDDC Manager, new management services and license server, remaining management components, and Global Manager for federated NSX only. The per-domain container states instance ordering and shared NSX requirements. Within each domain, NSX Manager and vCenter precede conditional Kubernetes Service and Supervisor, then image-based ESX. Stretched-cluster witness conditions accompany ESX. After ESX, in sequence: the NSX Edge clusters, NSX finalize and the vSphere Distributed Switch. Finishing tasks complete the domain stages.VCF 9.0.x to 9.1Identity Broker applianceIf on NSX overlay, or differentnetwork or datastore fromVCF management services:Redeploy before OperationsIf Operations on 9.1.x:KB 444734 instead1VCF Operationsand cloud proxyStart: Operations-hosting instance9.0 fleet appliance:decommission, not upgrade2Protection, recovery,load balancingvSphere ReplicationVMware Live Site RecoveryvSAN Data ProtectionAvi Load Balancer3SDDC Manager4New VCF managementservices andlicense server5Remaining managementcomponentsVCF Identity Broker applianceSame network and datastoreas VCF management servicesVCF AutomationVCF Operations orchestratorVCF Operations for networksVCF Operations for logsVCF Operations HCXData Services Manager6NSX Global ManagerFederated NSX onlyPer domain, in orderFirst to 9.1.x: Operations-hostinginstance’s fleet componentsand management domainThen: other instances’management domainsEach workload domain: after itsown management domainShared NSX: NSX, vCenter and ESXin every sharing domain7NSX Managerand vCenterEmbedded broker: with vCenter8Workload Managementenabled onlyvSphere KubernetesServiceSupervisorStretched clusterPhysical witness:manually before ESX hostsVirtual witness:in cluster workflow9ESXImage clusters only10After ESXNSX Edge clustersNSX finalizevSphere Distributed Switch11Finishing tasksData Services ManagerdatabasesVMware ToolsVirtual machinecompatibilityvSAN on-disk formatvSAN File Service
Figure 2. Upgrade order from VCF 9.0.x to 9.1, including Identity Broker prerequisites, instance ordering and conditional domain stages.

Within a workload domain the sequence is the NSX Global Manager where federated, NSX and vCenter, the move from baselines to images, the vSphere Kubernetes Service where Workload Management is enabled, the Supervisor, ESX, then the NSX Edge clusters, NSX finalize, the distributed switch and the vSAN on-disk format152426. NSX VIBs are upgraded in the ESX step, so hosts no longer enter maintenance mode during the NSX Manager upgrade. A physical vSAN witness host is upgraded by hand before the ESX hosts of its stretched cluster, a virtual witness in the cluster workflow20.

Broadcom documents two places to stop: after the management domain, workload domains may wait15, and the sequential domain plan gives NSX Manager and vCenter separate windows27. With NSX 9.1 over a vCenter on 9.0.x, NSX runs in a pinned state with features limited to vCenter 9.0, and new NSX 9.1 features stay inactive until every ESX host in all attached workload domains is upgraded23. Once VCF Operations is on 9.1, certificates and passwords for VCF Automation, VCF Identity Broker, VCF Operations for logs and VCF Operations for networks cannot be managed until those components follow15. A shared NSX 9.1 instance takes its NSX Manager, Edge cluster and finalize steps from the management domain only2. A workload domain without a vSphere cluster blocks patching and upgrades for itself and every domain sharing its NSX Manager28.

Patching 9.1.0.x to 9.1.1, and where to stop

Patch releases normally need no fixed order unless their release notes set one2, and the 9.1.0.x to 9.1.1 notes do4:

  • Fleet lifecycle reaches 9.1.1 before any other component.
  • VCF Operations is never patched in parallel, and no other lifecycle operation may run or start while it is patched.
  • VCF Operations and the license servers connected to it are patched before ESX hosts go to 9.1.1.0.
  • The VCF services runtime is patched before the identity broker and Salt RaaS instances it hosts.
  • VCF Automation is patched before the migration service engine. Where Data Services Manager is integrated, its upgrade guidance comes before VCF Automation.
  • While the software depot is patched, other patching is blocked.

Until those dependencies are met, the release notes warn against the Upgrade All button in VCF Operations4. The VCF Automation 9.1.1.0200 notes add that starting the migration service engine upgrade before the VCF Automation upgrade completes creates a deadlock that blocks both9.

The rules leave the other components unordered. SDDC Manager can be patched alone when its target is compatible with every BOM version in the instance29. Our recommendation is the order in Figure 3: SDDC lifecycle, the software depot and SDDC Manager one at a time after fleet lifecycle, so the depot is current before it serves other binaries, then VCF Operations in its own window, with the remaining dependencies above in their order. In each domain NSX and vCenter go before ESX, as the ESX procedure requires for upgrades20. Our recommendation is ESX one cluster at a time rather than the ten in parallel the procedure allows.

Patch order from 9.1.0.x to 9.1.1Order for patching VCF from 9.1.0.x to 9.1.1. Step 1: fleet lifecycle 9.1.1.0200, before any other component. Step 2: SDDC lifecycle, the software depot and SDDC Manager at 9.1.1.0200, one at a time. Step 3: VCF Operations 9.1.1.0100, which patches the cloud proxy and license server with it, with no other lifecycle operation running. Step 4: the VCF services runtime 9.1.1.0100, then the identity broker and Salt RaaS it hosts. Step 5: VCF Automation 9.1.1.0200, then the migration service engine and VCF Operations orchestrator 9.1.1.0100. Step 6: per domain, NSX and vCenter, then ESX, recommended one cluster at a time. Each step is verified before the next one starts, meaning checked, backed up and confirmed in the Interoperability Matrix against the components still waiting, so each arrow is a hold point. The end state is every component on its pinned build.Patch order from 9.1.0.x to 9.1.1Each arrow is a hold point1Fleet lifecycle 9.1.1.0200Before any other componentverified2SDDC lifecycle, depot, SDDC Manager9.1.1.0200, one at a timeverified3VCF Operations 9.1.1.0100Cloud proxy and license server with itNothing else runningverified4Services runtime 9.1.1.0100Then identity broker and Salt RaaSverified5VCF Automation 9.1.1.0200Then migration service engineand orchestrator 9.1.1.0100verified6Per domain: NSX and vCenterThen ESX, recommended one cluster at a timeverifiedEvery component on its pinned build Patch order from 9.1.0.x to 9.1.1Order for patching VCF from 9.1.0.x to 9.1.1. Step 1: fleet lifecycle 9.1.1.0200, before any other component. Step 2: SDDC lifecycle, the software depot and SDDC Manager at 9.1.1.0200, one at a time. Step 3: VCF Operations 9.1.1.0100, which patches the cloud proxy and license server with it, with no other lifecycle operation running. Step 4: the VCF services runtime 9.1.1.0100, then the identity broker and Salt RaaS it hosts. Step 5: VCF Automation 9.1.1.0200, then the migration service engine and VCF Operations orchestrator 9.1.1.0100. Step 6: per domain, NSX and vCenter, then ESX, recommended one cluster at a time. Each step is verified before the next one starts, meaning checked, backed up and confirmed in the Interoperability Matrix against the components still waiting, so each arrow is a hold point. The end state is every component on its pinned build.Patch order to 9.1.1Each arrow is a hold point1Fleet lifecycle9.1.1.0200, before anyother componentverified2SDDC lifecycle, depot,SDDC Manager 9.1.1.0200,one at a timeverified3VCF Operations9.1.1.0100 with cloud proxyand license server,nothing else runningverified4Services runtime9.1.1.0100, then identitybroker and Salt RaaSverified5VCF Automation9.1.1.0200, then migrationservice engine andorchestrator 9.1.1.0100verified6Per domainNSX and vCenter, then ESX,recommended one clusterat a timeverifiedEvery component onits pinned build
Figure 3. Patch order from VCF 9.1.0.x to 9.1.1, with a hold point after each verified step.

Our recommendation is to use the safe stopping points the planner’s 9.1.1 update marks for the route13. Elsewhere, our reading of the pick-by-impact rule3 is that a patched component is a stopping point once verified, meaning checked, backed up and matrix-compatible with the components still waiting2. Our recommendation is never to stop inside a VCF Operations or depot patch, never between VCF Automation and its orchestrators while they straddle 9.1.0.x and 9.1.1.x, and for ESX only at a cluster boundary with every host of that cluster on the target build.

Maintenance windows

In 9.1, with the optimized maintenance window option, vCenter’s reduced-downtime preparation runs first without downtime, then NSX Manager is upgraded and vCenter switched over in a single window. That option requires the vCenter target version to equal the current SDDC Manager version. The sequential option gives each component its own window, NSX Manager first. From 9.0 both options exist, from 5.2.x only the reduced downtime upgrade27.

ESX clusters upgrade in parallel by default, or in sequence if you choose, and with more than ten clusters selected the first ten run in parallel and the rest one after another20. The What’s New figure of 256 simultaneous cluster upgrades is an SDDC Manager scale figure24, and our recommendation is to size windows on the ten. After an ESX upgrade, the procedure asks for about 15 minutes of auto-reconciliation before another upgrade is scheduled, because an earlier one can be canceled or make the reconciliation fail20.

Live Patch does not apply to major upgrades, so ESX 9.0 to 9.1 runs in Auto mode or with Live Patch off. Enforce, which allows only Live Patch, blocks remediation when a host would need maintenance mode or a reboot20. ESX 9.1.1.0 is not live-patchable and needs a host reboot with VM migration or shutdown30, while ESX 9.1.1.0100 is live-patchable, with neither8. Hosts and VMs still have to meet the Live Patch prerequisites in KB 419942. Enforce fits only releases marked live-patchable.

Gates, hold criteria and retry evidence

Before a component is upgraded or patched, Broadcom asks for a backup of it and for prechecks, with errors remediated first1. VCF management services cannot be patched or upgraded until their external SFTP backup location is configured, and that location also receives the automatic backups taken during patch and upgrade procedures31, as the management backup guide describes. The precheck screen lists only errors, warnings and silenced results, the full report comes from the CSV export, and only the latest results are kept. A vSAN Skyline Health alert silenced in the vSphere Client makes SDDC Manager skip the related precheck, silenced prechecks neither warn nor block, and a failed precheck does not prevent an upgrade attempt32. A domain’s patch planner cannot be used while it has an upgrade plan, which has to be canceled first1, and its Component Versions tab compares installed and target versions, flags drift and shows each cluster at its lowest host version2.

  • Every route, depot owner: the target binaries in the configured depot. Evidence: the target builds under Binary Management.
  • Every route, backup owner: the SFTP target set and a fresh backup of each component in the change. Evidence: each component’s newest successful backup and its time. For management services, the dated backup points under Build > Lifecycle > VCF Management > Backup & Restore > Restore, after selecting the VCF Instance (KB 443851).
  • Every route, VCF Operations administrator: target-version prechecks with no errors, each silenced check restored or recorded as accepted. Evidence: the exported full report.
  • Every route, change owner: each target build compatible with the components still waiting. Evidence: the saved matrix result16.
  • Upgrade from 9.0.x, change owner: the identity broker and VCF Automation placement conditions above met. Evidence: the broker’s network and datastore, and the fleet lifecycle, SDDC lifecycle and SDDC Manager versions.
  • Patch from 9.1.0.x, change owner: fleet lifecycle at 9.1.1 first, nothing running when VCF Operations starts, and VCF Operations and the license server at 9.1.1.0100 before ESX. Evidence: the Component Versions tab and an empty task list.
  • vCenter on 8.0 Update 3 or 9.0.x going to 9.1 or 9.1.1, vSphere administrator: the Update Manager database check of KB 455737, which names vCenter 9.1.1.0100 as the fixed release6. Evidence: the checker output.
  • Every ESX step, vSphere administrator: clusters on images, no host or cluster in an error state, all hosts connected as recommended20, an image matching the target, and a vSphere cluster in every workload domain that shares the NSX Manager. Evidence: the imported image and a clean ESX precheck.
  • VCF Automation crossing to 9.1.1, automation owner: the Data Services Manager guidance done and the orchestrators in the same change. Evidence: both versions.

Our recommendation is to hold the next step when a gate lacks its evidence, when a precheck shows an error or a silenced check without a recorded decision, when a component shows Failed or drifts from its target, while another lifecycle task or a depot patch runs, and within 15 minutes of an ESX upgrade. ESX that goes ahead of VCF Operations breaks the release notes’ dependency.

A failed component shows its reason and remediation steps, and the upgrade is retried once they are resolved33. Failed ESX clusters or hosts can go into a new batch while the rest continue20. Our recommendation is to record the error, show the fix, pass the precheck again and check that the Upgrade History tab, which keeps past attempts34, agrees with the Component Versions tab before a second attempt, and to take a failure inside VCF Operations or the management services to Broadcom Support with the task details first. After a successful workload domain upgrade, the closing tasks are to remove the VM snapshots taken before it and to back up the new components26.

A failed component is recovered with its own procedure and backups, including the automatic ones31. For one VCF Automation 9.1 upgrade failure, Broadcom prescribes a rollback to 9.0 that is not supported as a standalone user task and needs a support request (KB 441260). Safe stopping points divide a successful change across windows and are no recovery path.

Four points stay open: whether the one-at-a-time rule applies per instance or fleet-wide, which cloud proxy and license server builds are right, whether the two 9.0 dates are different milestones, and any general rollback beyond pre-upgrade snapshots. Our recommendation is to raise them in one Broadcom Support case before the first 9.1.1 window.

Sources

Show all 34 sources
  1. Upgrade or Patch an Individual VCF Component
  2. Lifecycle Management of VCF Components
  3. Patch Releases 9.1.1.x
  4. VMware Cloud Foundation 9.1.1.0 Release Notes
  5. VCF Installer / SDDC Manager 9.1.1.0200 Release Notes
  6. VMware vCenter 9.1.1.0100 Release Notes
  7. NSX 9.1.1.0100 Release Notes
  8. ESX 9.1.1.0100 Release Notes
  9. VCF Automation 9.1.1.0200 Release Notes
  10. VCF Operations 9.1.1.0100 Release Notes
  11. VMware vCenter 9.1.1.0200 Release Notes
  12. VCF Automation 9.1.1.0 Release Notes
  13. Customer Favorite Capabilities: Accelerating Your Path to VCF 9.1.1
  14. Product Lifecycle Matrix
  15. Upgrading to VMware Cloud Foundation 9.1.x
  16. Broadcom Product Interoperability Matrix: Upgrade Path
  17. Announcing the VMware Cloud Foundation 9.1 Upgrade Planning Tool
  18. Binary Management for VMware Cloud Foundation
  19. Configure a Software Depot Connection Mode
  20. Upgrade ESX to 9.1
  21. Transitioning from vSphere Lifecycle Manager Baselines to vSphere Lifecycle Manager Images
  22. Managing vSphere Lifecycle Manager Images for VMware Cloud Foundation
  23. Create a New Workload Domain
  24. VCF Operations
  25. Redeploy VCF Identity Broker 9.0.x to a Supported Network and Datastore for Upgrade to 9.1
  26. Upgrading VMware Cloud Foundation Workload Domains to 9.1.x
  27. Plan a Domain Upgrade
  28. Create a New Workload Domain without a vSphere Cluster
  29. Upgrade or Patch SDDC Manager from VCF Operations
  30. ESX 9.1.1.0 Release Notes
  31. Configure an External SFTP Server for VCF Management Services and VCF Automation Backups
  32. Perform Upgrade Prechecks
  33. Monitoring VMware Cloud Foundation Upgrades
  34. Accessing the VMware Cloud Foundation Upgrade History