Since November 2, 2026, Site Recovery Manager (SRM), formerly VMware Live Site Recovery, is no longer sold on its own. KB 461219, published November 18, 2026, says its disaster recovery capabilities are now included in VMware Cloud Foundation (VCF) and VMware vSphere Foundation (VVF), and that every existing active VCF and VVF subscription customer is entitled to it. Existing subscribers choose between a term-limited key they can download today and the automatic entitlement that arrives with VCF and VVF 9.1.3, expected between February and April 2027. New, renewal and capacity expansion purchases of the new packaging made on or after November 2 include SRM with nothing to apply. Perpetual VCF licenses, with or without active Support and Subscription, are not entitled at all. The baseline here is 9.1.1 with the October 12, 2026, patches, among them Protection and Recovery 9.1.1.01001.
Our recommendation is to take the key now only where a recovery plan has to run before 9.1.3 ships, and only with a dated plan to put vCenter on 9.1 or later and the protection and recovery appliance on 9.1.3 before the key expires on May 2, 2027. Everyone else waits for 9.1.3 and uses the months until then to plan the move to vCenter 9.1, checked against the Interoperability Matrix for the appliance in use, so that only the appliance update to 9.1.3 remains once its release notes confirm the supported source builds. A customer who already owns SRM or VMware Live Site Recovery keeps that entitlement for the rest of its contract term. A perpetual license holder does not download the key.
What KB 461219 changes and who is entitled
Broadcom describes protection and recovery as planning, testing and running the recovery of VMs between a protected vCenter site and a recovery vCenter site. It replicates with vSphere Replication, or through a storage array’s own replication by way of a Storage Replication Adapter or, now deprecated, Virtual Volumes2. We read the recovery plans, protection groups and failover runs in that description as what KB 461219 calls SRM and moves into the platform subscriptions.
The KB lists three eligible situations, all for customers with an active VCF or VVF subscription: those who do not have SRM and want it, those who have SRM or VMware Live Site Recovery and want to renew it, and those who have it and want to protect more VMs. Customers who bought the new VCF or VVF packaging as a new, renewal or capacity expansion purchase on or after November 2, 2026, are told to ignore both options because SRM is already in their subscription. Perpetual VCF licenses are excluded with or without active Support and Subscription, and the KB tells those customers to buy a VCF or VVF subscription to use SRM.
The key’s terms limit it strictly to the customer’s active VCF or VVF subscription, under the Foundation Agreement and the VCF or VVF product-specific documentation. Support cases go to the Broadcom Support Portal under VMware vCenter Server > Protection and Recovery.
Existing subscribers: the term-limited key or 9.1.3
The first option is to wait. KB 461219 says the 9.1.3 release will include the SRM entitlement in existing VCF and VVF subscriptions automatically, and that customers then need protection and recovery appliance 9.1.3 and vCenter 9.1 or later to use it.
The second option is a term-limited key, which the KB offers to existing subscribers who need SRM capabilities immediately, before 9.1.3 exists. It sits under My Downloads in the Support Portal, not in the Licensing Portal: under VMware Cloud Foundation 9 or VMware vSphere Foundation 9, version 9.1 or later, a search for Protection and Recovery opens a group in which Protection and Recovery (Key) holds a PDF with the key and Protection and Recovery (incl. Replication, Disaster Recovery) holds the software. The key covers up to 10,000 protected VMs and expires on May 2, 2027. It cannot be split, combined, upgraded or downgraded. When 9.1.3 becomes available, customers must upgrade the appliance to 9.1.3 and vCenter to 9.1 or later before the key expires to maintain service continuity. The KB’s FAQ adds that the expiry date allows time for that upgrade, so that disaster recovery functions do not cease.
Version minimums apply to the key. KB 461219 says it works with both version 8 and version 9 releases, without naming the component, and then sets the appliance floor: 9.0.2.4 for separate, non-combined appliances and 9.0.5.1 or later for combined protection and recovery appliances. For the minimum vCenter it points to the Interoperability Matrix and to KB 438925. That KB, published November 10, 2026, explains why: keys generated on or after April 20, 2026, use a format that older appliances reject with an “Invalid license key” error. The upgrade it requires is mandatory: 9.0.1 to 9.0.2.3 go to 9.0.2.4 or later, 9.0.3 to 9.0.5 go to 9.0.5.1 or later, and 9.1.0.0 goes to 9.1.0.0100 or later. KB 461219 leaves the 9.1.0.0 case out, so our recommendation is to treat 9.1.0.0100 as the floor for a 9.1.0 appliance before the key is applied.
The two KBs also differ on what to do if the error persists after the upgrade. KB 438925 suggests a split and merge of the license in the Support Portal to refresh its metadata, while KB 461219 says the term-limited key cannot be split or combined. Our recommendation is to leave the key as issued and open a case under VMware vCenter Server > Protection and Recovery.
The key gives recovery plans now, but it starts a deadline that 9.1.3 itself may only just meet. If 9.1.3 ships in late April 2027, only days remain before the key expires. Our recommendation is to take the key only when a recovery plan is needed before 9.1.3 and the vCenter upgrade to 9.1 at both sites can be finished well ahead of that window. For a customer still on vCenter 8 with no approved path to 9.1, our recommendation is not to rely on the key.
Customers who already have SRM or VMware Live Site Recovery
The KB’s FAQ says these customers can keep using their existing entitlements for the rest of the contract term, with their current benefits, including support for older vCenter and appliance versions where that applies. They can also swap their licenses for one of the two options to protect more VMs, provided the environment meets the version requirements of the option they choose.
The existing entitlement is the only route that keeps older vCenter and appliance versions supported, and it runs until the contract ends, so the next route has to be ready by the contract end date. If that date falls before 9.1.3 ships, the term-limited key bridges the gap, and May 2, 2027, becomes the deadline for appliance 9.1.3 and vCenter 9.1 or later. Our recommendation is to keep the existing entitlement while either site runs a vCenter or an appliance below the key’s minimums, to swap only when the protected VM count outgrows it and both sites meet the chosen route, and to record the contract end date and the key expiry side by side.
Perpetual licenses and new purchases
A perpetual VCF license gives no SRM entitlement under KB 461219, whether or not Support and Subscription is active. The key’s terms bind it to an active subscription, so our recommendation is not to download or apply it on a perpetual-only platform. Existing disaster recovery tooling stays as licensed.
A new buyer, or a customer renewing or expanding on the new packaging from November 2, 2026, gets SRM in the subscription, and the KB tells them to disregard both options. How that subscription activates SRM on appliances older than 9.1.3 is left open. Our recommendation is to keep the order date and the packaging name with the license records, because the KB draws its line by both, and to read the minimum vCenter and appliance versions in the Interoperability Matrix before deployment.
What the inclusion does not cover, and where the documents disagree
KB 461219 speaks only of disaster recovery capabilities. The feature comparison and the VCF FAQ treat cyber recovery separately. The 9.1.1 feature comparison of November 16, 2026, does not list SRM at all. Among its advanced services, which footnote 13 describes as separate purchases outside the core VCF and VVF offerings, VMware Live Recovery for on-premises cyber recovery is marked for VCF Edge and VCF only, and VMware Live Recovery Cloud, for cyber and disaster recovery to VMware Cloud on AWS, for all three editions. vSAN cyber recovery clusters are marked for VCF Edge and VCF with footnote 15, which requires the VMware Live Recovery add-on. vSphere Replication, immutable local and remote snapshots and Any-to-vSAN Replication are marked for vSphere Foundation, VCF Edge and VCF3.
For VCF, the FAQ of November 8, 2026, predates the KB. Its question 74 places vSAN ESA local snapshots and vSAN remote replication, on-premises disaster recovery with enhanced vSphere Replication at RPOs as low as one minute and more in the core entitlement. Question 75 leaves out cyber recovery workflows with EDR integration, including the Carbon Black entitlement for the clean room, and cloud disaster recovery. Question 31 adds that vSAN local snapshots and replication are included with the VCF license. Question 79 says the SRM management pack for VCF Operations has to be downloaded from the VMware Marketplace4.
For VVF, the 9.1 FAQ still lists Site Recovery Manager among the add-ons, under a question headed vSphere Foundation 9.05. The Protection and Recovery 9.1 welcome page asks for a VMware Live Recovery license for on-premises cyber recovery and says protection and recovery for on-premises workloads is available by purchasing a subscription2, and the subscriptions page says the full set of capabilities needs a purchased subscription6. By our reading, those pages predate the change, and the KB is the newest dated statement and the only one written for it. Our recommendation is to plan on the KB for SRM, keep the KB and the key PDF with the license records, and open a case if the product shows something different. By our reading of the comparison and the VCF FAQ, the inclusion does not extend to cyber recovery, and under the comparison a VVF subscription has no on-premises cyber recovery add-on at all.
Getting to 9.1.3 before May 2, 2027
KB 461219 names only vCenter 9.1 or later and appliance 9.1.3, and for anything else points to the VCF 9.1.x upgrade documentation and the Interoperability Matrix7. The vCenter half of the requirement does not depend on 9.1.3, so it can be planned now. Before vCenter moves to 9.1, the Interoperability Matrix has to show that the protection and recovery appliance in use supports the target vCenter, and the documented order by site upgrades protection and recovery before vCenter at each site8. Check the exact source-to-target path: KB 454369 says vCenter 8.0 U3k cannot be upgraded directly to 9.1.0 but can be upgraded to 9.1.1. A VCF 5.2 environment follows the VCF 5.2 to 9.1.1 upgrade, and a VVF environment on vSphere 8 the vSphere Foundation 9.1 upgrade.
Older appliances are the larger task. The 9.1.1.0100 release notes say an upgrade from VMware Live Site Recovery 9.0.2.3, vSphere Replication 9.0.2.3 or vSAN Data Protection 8.0 Update 3 first deploys the 9.1.1.0100 appliance at the protected and the recovery site. Upgrading vSphere Replication to 9.1.1.0100 requires every replication to be reconfigured to enhanced replication, and before an upgrade to 9.1.1.0 the VRMS database must hold the lookup service certificate, and the notes point to a separate KB for the fix when it is missing1. Convergence, appliance placement and the engine choice are covered in protection and recovery design in VCF 9.1 and, for VVF, in backup, protection and recovery in vSphere Foundation 9.1.
Broadcom documents two upgrade orders. Upgrading by site starts at the protected site, so that disaster recovery to the recovery site is still possible if the upgrade leaves the protected site unusable: protection and recovery first, then any storage replication adapters, then vCenter, then the hosts, and the same at the recovery site. Upgrading by component does protection and recovery and the adapters at both sites before either vCenter. Both end by checking the connection between the sites and that protection groups and recovery plans are still valid. In Enhanced Linked Mode, protection and recovery is never upgraded under more than one vCenter at a time8. Within the platform upgrade procedure, our recommendation is the order by site for the move to vCenter 9.1 and to 9.1.3, with the most critical site first where protection runs in both directions, as the same page advises.
Broadcom asks for a recovery plan to be tested whenever it is created or changed, and a test does not disrupt replication or work at either site, except for plans that suspend local VMs, which do so in tests as well9. Our recommendation is a test of every recovery plan after the key is applied, after each site’s upgrade and after 9.1.3, with the cleanup completed each time.
Checklist and hold points
- Entitlement check. Owner: license administrator. Evidence: an active VCF or VVF subscription in the Support Portal, no reliance on a perpetual license, the order date and packaging for purchases from November 2, 2026, and the end date of any existing SRM or VMware Live Site Recovery contract.
- Current versions. Owner: vSphere administrator. Evidence: the vCenter version at each site, and each appliance’s version and type (separate or combined) checked against 9.0.2.4, 9.0.5.1 or 9.1.0.0100 and against the Interoperability Matrix.
- Key downloaded and applied, on the key route only. Owner: disaster recovery administrator. Evidence: the key PDF from
My Downloads, the key accepted without an “Invalid license key” error, and no more than 10,000 protected VMs. - Expiry recorded. Owner: license administrator. Evidence: May 2, 2027, in the license register with a named owner, next to any existing contract end date.
- Upgrade plan. Owner: platform architect. Evidence: a checked source-to-target vCenter path, an Interoperability Matrix result for the appliance with the target vCenter, vCenter 9.1 or later at both sites, appliances on 9.1.x with the certificate query and enhanced replication done, and a change window for 9.1.3 booked before May 2, 2027, in the order by site.
- Recovery test. Owner: disaster recovery administrator with the application owners. Evidence: a test report for every recovery plan after the key, after each site’s upgrade and after 9.1.3, with cleanup completed and protection groups and recovery plans valid.
Our recommendation is to hold at each of these points. If the entitlement check fails, do not download the key, and keep existing protection as it is. Retry when the active subscription is shown in the Support Portal. If an appliance is below its minimum, upgrade it and stop before the key is applied. Retry when the appliance reports the minimum version or later. If the key is rejected after that, stop with the key unapplied and existing protection unchanged. Retry when the support case gives a resolution. If the protected VM count would exceed 10,000, keep the extra VMs out of recovery plans until Broadcom confirms in writing how to cover them. Stop before the vCenter upgrade at either site if the Interoperability Matrix does not list the appliance in use with the target vCenter. Retry with a Matrix result that does, after an appliance upgrade where needed.
Our recommendation is also that, without a recorded expiry and an approved upgrade plan, no recovery time is promised to a service owner on the strength of the key, and replication keeps running without anyone counting on recovery plans. Retry when both are on record with vCenter 9.1 or later at both sites. During the move to 9.1.3, our recommendation is to stop after the protected site if the connection or the recovery plans fail validation. Retry when the connection and every plan show valid. A failed recovery test holds the declaration that disaster recovery is ready. Retry with a clean test report and a completed cleanup.
Some points stay open until Broadcom answers in writing: which vCenter versions the key accepts beyond the appliance floors, whether one key covers both sites of a pair, how the 9.1.3 entitlement replaces an applied key, how a new-packaging subscription activates SRM on appliances older than 9.1.3, and when the FAQ, comparison and Protection and Recovery pages will name SRM. Until then, our recommendation is the conservative reading at each gap: vCenter 9.1 or later before relying on the key, the appliance floors including 9.1.0.0100, no split or merge of the key, and no cyber recovery assumed from the inclusion. The date to work back from is May 2, 2027, or an earlier contract end date, and the vCenter 9.1 plan, checked against the Interoperability Matrix, is the part that can start now.
Sources
Show all 9 sources
- Protection and Recovery 9.1.1.0100 Release Notes
- Welcome to Protection and Recovery
- VMware Cloud Foundation 9.1.1 and VMware vSphere Foundation 9.1.1: Feature Comparison & Upgrade Paths
- VMware Cloud Foundation 9.1 Frequently Asked Questions
- VMware vSphere Foundation 9.1 Frequently Asked Questions (FAQs)
- Managing Subscriptions
- Upgrading to VMware Cloud Foundation 9.1.x
- Order of Upgrading vSphere and Protection and Recovery Components
- Testing a Recovery Plan