Skip to content

From Aria Automation to VCF Automation 9.1: the upgrade, VM Apps and the move to All Apps

An upgrade from Aria Automation 8.18 to VCF Automation 9.1 keeps the old automation model. Each 8.18 tenant becomes a VM Apps organization1, the type Broadcom aims at Aria Automation users who want to continue “with minimal disruptions”2. A single-tenant instance becomes one, the first in the new instance3. The newer services, from Kubernetes and VPC networking to databases and Harbor registries, belong to All Apps organizations, which need vSphere Supervisor clusters and are created separately by the provider24.

The baseline is VCF 9.1.1 with the October 12, 2026, patches. That means a source of Aria Automation 8.18.1 or later5 and a target of VCF Automation 9.1.1.0200, build 258015706. External orchestrators start from Aria Automation Orchestrator 8.18.1 or later7 and end on the 9.1.1 line, whose newest patch is VCF Operations orchestrator 9.1.1.0100, build 257951018.

In the 9.1 pages cited here, only VMs have a documented import path, into a vSphere Namespace, and blueprints and extensibility have none. VCF Automation 9.1.1 deprecates native AWS, Azure and GCP management in VM Apps organizations and turns it off by default9.

Deciding what to upgrade now and what to move later

Broadcom recommends All Apps from the start for greenfield environments without Aria Automation dependencies, and describes the bimodal design as an easier transition path for Aria Automation customers3.

Our recommendation is to plan the platform upgrade and the move to All Apps as separate projects. The upgrade’s date is set by the blockers below, while the move to All Apps needs Supervisor capacity, VPC networking, people to rebuild blueprints and extensibility, and its own plan and approval. Broadcom’s multi-fleet design pattern supports only the VM Apps model3, so automation that spans several VCF fleets stays there.

Order, target build and version pairing

From VCF 5.2.x, Aria Automation is step 9 of the documented upgrade order, after SDDC Manager and the new VCF management services and license server, and Aria Automation Orchestrator is step 1010. The 8.18 instance is first imported into VCF Operations from the management cluster of the management domain vCenter of its target VCF Instance, and moving it to another vCenter requires reconfiguring the network. The import needs the primary node’s SSH password and ends with a Sync11.

An 8.18.x appliance that is not on the primary datastore of its VCF Instance can be upgraded only to VCF Automation 9.1.1.0200 or later, and only when fleet lifecycle, SDDC lifecycle and SDDC Manager are at 9.1.1.0200 or later too56. The same release notes fix the migration of an 8.18.x upstream proxy, which earlier 9.1 builds discard, so that cloud accounts relying on it fail validation after the upgrade6. Our recommendation is to target 9.1.1.0200 for every instance.

Broadcom documents that VCF Automation and the orchestrator must match up to the subminor digit, both 9.1.0.x or both 9.1.1.x, because in 9.1.1 the orchestrator’s calls to the Provider Management API need a token scope added in that release912. Orchestrator integrations and content carry over into the VM Apps organization, but external instances are upgraded only after VCF Automation12, so each one that uses VCF Automation as its authentication provider is out of step from the switchover until its own upgrade finishes. Our recommendation is to upgrade them in the same change, by the ISO procedure with a snapshot without memory taken first7.

Blockers, by how far they move the date

KB 389563 lists features that 9.x no longer offers: Virtual Private Zones and provider image management, VMware Cloud Director cloud accounts, the Cloud Consumption Interface, Kubernetes integrations such as TKG and TMC, NSX-V or NSX-T Manager Mode cloud accounts, and Avi Load Balancer cloud accounts. For the NSX accounts it says not to upgrade until a migration plan from Broadcom Support or Professional Services is in place, since removing an NSX endpoint leaves existing deployments without day-2 operations. An environment that uses Avi cloud accounts must not be upgraded for now.

VCF Automation 9.x enforces FIPS 140-2 for external integration endpoints, so an IPAM endpoint that skips certificate checks, an Aria Operations integration endpoint or an LDAP integration over plain LDAP can block the upgrade. The truststore is not migrated either, so endpoints that relied on it fail with TLS errors unless KB 425489 is followed first, and KB 447667 if the problem remains5. KB 425489 explains that only the Postgres database content migrates, and runs its remediation script on an 8.18.1 node after a backup or snapshot, which is also the way back. For an Aria Operations endpoint on an 8.18.x source, the only remedy in KB 447667 is to leave that endpoint type out of the precheck.

The public cloud change does not block the upgrade, but it also applies to upgraded installations and limits users afterward. For an 8.18.x source, the re-enable procedure (KB 448993) can be applied only after the upgrade, by a Service Broker Administrator or Assembler Administrator9. It runs as root on a VCF Automation node and restarts the provisioning, catalog and blueprint services, which are briefly unavailable, so it belongs in a maintenance window or a period of low activity (KB 448993).

Until then, create, read, update and delete operations are restricted for cloud accounts, cloud zones, projects, image, flavor, network and storage profiles, networks and security groups. Deployments with public cloud resources cannot be created, updated or deleted, and existing ones are marked Stale unless they use Terraform configurations. Only lease management remains as a day-2 action. Catalog items stay visible, but requests that use public cloud resources fail, onboarding plans that use them are blocked, and new blueprints with such resources are flagged Invalid and cannot be versioned or released. Blueprints that use custom Terraform providers are not affected9.

A single-node extra-large 8.18.x deployment has to be scaled out to three nodes, and an integrated Data Services Manager follows its own upgrade guidance before VCF Automation. If 198.18.0.0/15, the internal block of the VCF services runtime, is already used on your network, the internal block for VCF management services has to change to 240.0.0.0/15 or 250.0.0.0/155.

Eight independent upgrade checksThe lettered checks are independent, not sequential. A: cloud accounts and integrations listed in KB 389563. NSX-V and NSX-T Manager Mode accounts need a migration plan first, and Avi Load Balancer cloud accounts mean no upgrade. Virtual Private Zones and provider image management, Cloud Director accounts, the Cloud Consumption Interface and Kubernetes integrations are also checked. B: an 8.18.x appliance not on its VCF Instance’s primary datastore requires VCF Automation 9.1.1.0200 or later, with fleet lifecycle, SDDC lifecycle and SDDC Manager at that minimum too. C: external integrations require FIPS 140-2. IPAM skipping certificate checks, an Aria Operations integration endpoint and plain LDAP can block the upgrade. D: truststore-dependent endpoints need KB 425489 first to avoid TLS errors, then KB 447667 if errors persist. E: AWS, Azure and GCP projects do not block the upgrade but lose most self-service until KB 448993, applied only after the upgrade in a maintenance window or low-activity period. F: single-node extra-large 8.18.x deployments need three nodes before upgrading. G: integrated Data Services Manager follows its own upgrade guidance before VCF Automation. H: an existing network use of 198.18.0.0/15 requires changing the VCF management services internal block to 240.0.0.0/15 or 250.0.0.0/15.ACloud accounts andintegrations listedin KB 389563NSX-V, Manager Mode:migration plan firstAvi cloud accounts:do not upgradeAlso checked: Virtual PrivateZones, image management,Cloud Director, CCI,Kubernetes integrationsB8.18.x appliance not onVCF Instance primarydatastoreVCF Automation9.1.1.0200 or laterSame minimum: fleet lifecycle,SDDC lifecycle, SDDC ManagerCExternal integrationendpointsFIPS 140-2 requiredCan block: IPAM skippingcertificate checks, AriaOperations endpoint, plain LDAPDTruststore-dependentendpointsKB 425489 firstOtherwise TLS errorsPersistent TLS errors:KB 447667EAWS, Azure, GCPprojectsNot an upgrade blockerSelf-service mostly stopsuntil KB 448993Apply only after upgrade:maintenance window orlow-activity periodF8.18.x single-nodeextra-largeThree nodesbefore upgradeGData ServicesManagerintegratedIts upgrade guidancebefore VCF AutomationH198.18.0.0/15 alreadyused on your networkChange VCF managementservices internal block240.0.0.0/15 or 250.0.0.0/15 Eight independent upgrade checksThe lettered checks are independent, not sequential. A: cloud accounts and integrations listed in KB 389563. NSX-V and NSX-T Manager Mode accounts need a migration plan first, and Avi Load Balancer cloud accounts mean no upgrade. Virtual Private Zones and provider image management, Cloud Director accounts, the Cloud Consumption Interface and Kubernetes integrations are also checked. B: an 8.18.x appliance not on its VCF Instance’s primary datastore requires VCF Automation 9.1.1.0200 or later, with fleet lifecycle, SDDC lifecycle and SDDC Manager at that minimum too. C: external integrations require FIPS 140-2. IPAM skipping certificate checks, an Aria Operations integration endpoint and plain LDAP can block the upgrade. D: truststore-dependent endpoints need KB 425489 first to avoid TLS errors, then KB 447667 if errors persist. E: AWS, Azure and GCP projects do not block the upgrade but lose most self-service until KB 448993, applied only after the upgrade in a maintenance window or low-activity period. F: single-node extra-large 8.18.x deployments need three nodes before upgrading. G: integrated Data Services Manager follows its own upgrade guidance before VCF Automation. H: an existing network use of 198.18.0.0/15 requires changing the VCF management services internal block to 240.0.0.0/15 or 250.0.0.0/15.ACloud accounts andintegrations listedin KB 389563NSX-V, Manager Mode:migration plan firstAvi cloud accounts:do not upgradeAlso checked: Virtual PrivateZones, image management,Cloud Director, CCI,Kubernetes integrationsB8.18.x appliance not onVCF Instance primarydatastoreVCF Automation9.1.1.0200 or laterSame minimum: fleet lifecycle,SDDC lifecycle, SDDC ManagerCExternal integrationendpointsFIPS 140-2 requiredCan block: IPAM skippingcertificate checks, AriaOperations endpoint, plain LDAPDTruststore-dependentendpointsKB 425489 firstOtherwise TLS errorsPersistent TLS errors:KB 447667EAWS, Azure, GCPprojectsNot an upgrade blockerSelf-service mostly stopsuntil KB 448993Apply only after upgrade:maintenance window orlow-activity periodF8.18.x single-nodeextra-largeThree nodesbefore upgradeGData ServicesManagerintegratedIts upgrade guidancebefore VCF AutomationH198.18.0.0/15 alreadyused on your networkChange VCF managementservices internal block240.0.0.0/15 or 250.0.0.0/15
Figure 1. Eight independent upgrade checks, with their conditions, required actions and service impacts.

Readiness checklist

Broadcom documents the requirements. The roles and the evidence are our recommendation.

  • Automation administrator, source. Evidence: Aria Automation 8.18.1 or later imported and listed on the VCF Management Components tab after the Sync511, and a written answer to every KB 389563 precheck area, and the 8.18 tenant list with each tenant’s vCenter and NSX Manager.
  • Network team, VCF services runtime. Evidence: a lowercase runtime FQDN in DNS that resolves outside the node addresses, and five reserved addresses on the network of the current Automation nodes, three for the nodes and two held back for lifecycle operations513. Neither may come from the management services runtime, and 198.18.0.0/15 must be unused on the network or the management services block moved to 240.0.0.0/15 or 250.0.0.0/155.
  • Certificate owner. Evidence: a SAN that lists the FQDN and IP address of every node and of the load balancer or VIP, or a compliant replacement certificate already installed5.
  • Integration owners for IPAM, LDAP, Aria Operations, vSphere and NSX endpoints. Evidence: the endpoint certificate and FIPS prechecks passing (KB 425489 and KB 447667), and for an Aria Operations endpoint left out of the precheck, a recorded exception and a functional test after the switch.
  • Lifecycle administrator, depot and versions. Evidence: the 9.1.x install binaries for VCF Automation and the migration service engine in the depot, any integrated Data Services Manager already upgraded, and for an appliance off the primary datastore, fleet lifecycle, SDDC lifecycle and SDDC Manager at 9.1.1.020056.
  • Capacity owner, sizing. Evidence: the target size from the Planning and Preparation Workbook, where Medium maps to Medium and Extra Large to Large, and a single-node extra-large instance already running as three nodes513.
  • Backup owner. Evidence: backups of all 8.18 nodes and the Identity Manager (Workspace ONE Access) appliance taken together, Automation snapshots quiesced, without memory and started within 40 seconds of each other, with no Freeze synchronization failed journal entry (KB 379005), and a memoryless snapshot of each external orchestrator7.
  • Cloud account owner, baseline. Evidence: Validate Connection passing in VCF Operations for the cloud accounts that integrate VCF Automation5, and a list of working 8.18 integration endpoints.
  • Service owner for public cloud projects. Evidence: a change booked after the upgrade for KB 448993, and users told about the gap.

Running the upgrade

Both the import and the upgrade start from Build, Lifecycle and VCF Management in VCF Operations511. After an upgrade plan maps the binary, the wizard asks for the runtime node IP pool or CIDR, the runtime FQDN and one password of at least 15 characters for the vmware-system-user and admin accounts, and its prechecks are rerun until nothing fails5.

The upgrade is a blue-green deployment. A new VCF Automation instance is provisioned on its own VCF services runtime while the existing one stays active, data and configuration are migrated, and only then does network traffic switch to 9.1. The FQDN of the old instance moves to the new one, so users keep their address, the IP addresses of the 8.18.x nodes become VIPs of the 9.1 instance, and the source nodes shut down automatically13. The 8.18 certificate is kept and reused, and an external load balancer needs no changes5.

Blue-green upgrade and address handoverFour steps run downward. First, provision a new VCF Automation instance on its own VCF services runtime while the existing instance remains active. Second, migrate data and configuration. Third, switch traffic to 9.1. Fourth, automatically shut down the source nodes. At the traffic switch, the old FQDN moves to the new instance, preserving the users’ address, and the 8.18.x node IP addresses become 9.1 VIPs.1Provision new instanceOwn VCF services runtimeExisting instance stays active2MigrateData and configuration3Switch network traffic to 9.1At the switchOld instance FQDNmovesNew 9.1 instanceUsers keep their address8.18.x node IPsbecome9.1 instance VIPsAfter switch4Source nodes shut downAutomatically Blue-green upgrade and address handoverFour steps run downward. First, provision a new VCF Automation instance on its own VCF services runtime while the existing instance remains active. Second, migrate data and configuration. Third, switch traffic to 9.1. Fourth, automatically shut down the source nodes. At the traffic switch, the old FQDN moves to the new instance, preserving the users’ address, and the 8.18.x node IP addresses become 9.1 VIPs.1Provision new instanceOwn VCF services runtimeExisting instance stays active2MigrateData and configuration3Switch network traffic to 9.1At the switchOld instance FQDNmovesNew 9.1 instanceUsers keep their address8.18.x node IPsbecome9.1 instance VIPsAfter switch4Source nodes shut downAutomatically
Figure 2. The blue-green upgrade migrates data before switching traffic, then transfers the existing address to the new instance.

Hold criteria, stopping points and retries

The upgrade pages describe no rollback513. KB 441333 states that cleanup after a failed VCF Automation upgrade is not supported without Broadcom Support, and its own procedure removes VCF Automation from the fleet completely. Our recommendation is to ask Broadcom Support before the window what a rollback would involve, and to treat two points as safe stops: before the VCF Automation upgrade starts, and after the last external orchestrator shows a 9.1.1 build and the post-switch checks below pass. Our hold criteria, each a reason to stop:

  • Before the start: Avi cloud accounts in use, NSX-V or Manager Mode cloud accounts without a migration plan (KB 389563), two tenants sharing a vCenter or NSX Manager without Broadcom Support’s written answer (KB 408990), any checklist item without its evidence, a precheck still failing5, a missing backup set, or a journal entry showing that the Automation snapshots did not quiesce together (KB 379005). Do not start.
  • Any failure in the VCF Automation run. Do not start an orchestrator or clean up components, and open a support case (KB 441333).
  • A failure reported by an orchestrator upgrade. Only the documented false failure, a post-upgrade health check naming a vco-app pod that is not ready, may be set aside, once all pods run and the health status page answers RUNNING within 5 to 10 minutes7. KB 459464 shows a real failure in an 8.18.1 to 9.1.0 upgrade, fixed from the logs before the upgrade resumes.
  • After the switch: a cloud account that passed Validate Connection before and fails now, an integration endpoint that worked on 8.18 and fails on 9.1, or an orchestrator whose vracli version output shows a build outside the 9.1.1 line57.

Our recommendation is to retry the VCF Automation upgrade only when the support case names the cause and confirms the cleanup, the prechecks pass and a fresh 8.18 backup set exists, and an orchestrator only with the cause fixed, the appliance answering RUNNING and a fresh snapshot. A reverted orchestrator is back on its old build while VCF Automation stays on 9.1.1, outside the supported pairing912, so its retry follows at once or goes to Broadcom Support.

After the switch, the source nodes are shut down and can be deleted once they are no longer needed5. Our recommendation is to keep them until validation and the identity migration are complete, but not as a fallback. Since their addresses and FQDN now belong to the 9.1 instance13, the old nodes cannot simply be powered on again.

Identity Manager and the SSO migration

Aria Suite Lifecycle and VMware Identity Manager have no upgrade to 9.1. Suite Lifecycle stops managing VCF Automation but stays for Day-N operations on Identity Manager 3.3.x, and the 9.1 identity broker is deployed with the VCF management services during the upgrade10. Identity Manager is still an authentication source for VCF Automation 9.1 and must not be deleted5. Retiring both is a separate SSO migration, in which the VM Apps organization swaps its legacy Identity Manager OIDC connection for a direct identity provider connection, and the Identity Manager configuration comes out only once users and groups authenticate through the new provider14.

The second migration: from VM Apps to All Apps

The Provider Management UI creates only one VM Apps organization per deployment, so any further one needs the API1. The organization administrator manages its cloud accounts, cloud zones and projects, and event subscriptions trigger extensibility actions or VCF Operations orchestrator workflows15.

The All Apps side needs a vCenter with a Supervisor enabled4, on an existing cluster with enough capacity or a new cluster in the same vCenter3. With the Mixed Tenancy Mode feature flag on, All Apps organizations can share the vCenter and NSX Local Manager of the upgraded environment. For a single tenant, the converted environment is the first organization of the new instance, which meets the design page’s rule that VM Apps comes first3. Because the design library advises in general against mixing network consumption models in one workload domain under VCF Automation16, our recommendation is separate workload domains until Broadcom says whether that covers Mixed Tenancy.

The upgrade imports the vCenter cloud accounts of Aria Automation as connections in the VM Apps organization, and those connections can create regions for All Apps organizations17. The region is fixed once it is assigned with a quota, and changing it means deleting the organization and creating a new one. Regional networking is set at creation or later, with centralized or distributed connections, and the provider adds a first user who connects the organization to an identity provider4. Existing VM Apps workloads keep their VDS VLAN or NSX segment networking, routing and IP addressing, and new All Apps workloads use VPCs3.

Aria Automation 8.18
VM Apps organization
All Apps organization
Tenancy
Aria Automation 8.18: Tenants
VM Apps organization: Each tenant becomes its own organization, further ones only through the API
All Apps organization: Created by the provider with a region quota, after which the region is fixed
Infrastructure
Aria Automation 8.18: vCenter cloud accounts
VM Apps organization: Cloud accounts and cloud zones set by the organization administrator
All Apps organization: Region on a Supervisor-enabled cluster, with an upgraded vCenter account able to serve as its connection
Networking
Aria Automation 8.18: VDS VLAN or NSX segments
VM Apps organization: Same networks, routing and IP addressing
All Apps organization: VPCs over a centralized or distributed connection
Identity
Aria Automation 8.18: VMware Identity Manager, managed by Aria Suite Lifecycle
VM Apps organization: Identity Manager at first, then a direct identity provider connection
All Apps organization: Its own identity provider, connected by the first user
Content
Aria Automation 8.18: Blueprints and extensibility
VM Apps organization: Carried over with the migrated data and configuration
All Apps organization: No conversion in the cited 9.1 pages: built in the Blueprint Designer or YAML, or captured from a namespace
Figure 3. How Aria Automation constructs carry into VM Apps and All Apps organizations in VCF Automation 9.1.

The design library’s plan keeps existing workloads in VM Apps, pilots new services and teams in All Apps, and moves eligible workloads and users across at a pace teams can manage3. All Apps blueprints are written in the Blueprint Designer or in YAML and can be imported and exported as YAML, but the blueprint overview does not mention importing VM Apps templates18. Our recommendation is to plan for rebuilding them. Once VMs run in a namespace, a capture records them with their PVCs, the VPC configuration, load balancers and shared subnets, and saves the VMs to a project content library. Namespaces with VKS clusters, Avi load balancers or vSphere Pods cannot be captured19, and the 9.1.0 release notes, with no fix listed for 9.1.1, add that a capture leaves out the SubnetConnectionBindingMap resource917.

In All Apps, custom resources are built on VCF Operations orchestrator workflows, which requires an orchestrator instance associated with the organization, and every resource type name starts with Custom.20. Event subscriptions are project-specific, and the All Apps page names only orchestrator workflows as runnable items21. Unless Broadcom documents another route, our recommendation is to plan on rewriting the extensibility actions that VM Apps subscriptions run today as orchestrator workflows, and to measure the move early by an inventory of those actions rather than a count of VMs.

For existing VMs, vSphere Supervisor 9.1 adds non-disruptive import into a vSphere Namespace under VM Service management, through the VCF-A VCD Migration Tool or the API, in batches with a defined order that can be rolled back while in progress22. Individual import in the vSphere Client may disrupt a VM by reconfiguring its network identity, while the API keeps network identity and affinity rules and accepts VMs with snapshots23, and an ImportOperationBatch can wait for approval before commit or return every VM to its original vSphere state24.

Four questions stay open: how an upgrade handles 8.18 tenants whose cloud accounts share a vCenter or NSX Manager, given that two VM Apps organizations cannot (KB 408990), how an imported VM appears in an All Apps project and what happens to the VM Apps deployment that owned it, any restore of the 8.18 backups as a way back after the switch, and which 9.1.1 build the orchestrator ISO installs and whether the 9.1.1.0100 patch, applied through VCF Operations8, then reaches that external instance.

Our recommendation for the first wave is to import one disposable VM in a batch set to wait before commit, record what the All Apps project and the old VM Apps deployment show before and after the commit, and plan production waves only once that handover is documented or confirmed by Broadcom Support.

Sources

Show all 24 sources
  1. Create a VCF Automation Organization for VM Applications
  2. Organization Management
  3. Bimodal Consumption Design for VM Apps and All Apps Workloads
  4. Create a VCF Automation Organization for All Applications
  5. Upgrade VCF Automation to 9.1
  6. VCF Automation 9.1.1.0200 Release Notes
  7. Upgrade VCF Operations Orchestrator to 9.1
  8. VCF Operations Orchestrator 9.1.1.0100 Release Notes
  9. VCF Automation 9.1.1.0 Release Notes
  10. Upgrading to VMware Cloud Foundation 9.1.x
  11. Import an Existing VMware Aria Automation Instance in VCF Operations
  12. Configure VCF Operations Orchestrator for VCF Automation VM Apps Organizations
  13. Upgrading to VCF Automation 9.1
  14. Migrate VCF Automation Authentication from VMware Identity Manager to VCF Identity Broker
  15. Managing Organizations for VM Apps in VMware Cloud Foundation Automation
  16. Centralized Connectivity Model
  17. VCF Automation 9.1.0 Known Issues
  18. Managing Blueprints in VCF Automation
  19. Capturing Namespaces as Blueprints in VCF Automation
  20. Managing Custom Resources in VCF Automation Blueprints
  21. Managing Event Subscriptions in VCF Automation
  22. VMware vSphere Supervisor 9.1 Release Notes
  23. Importing Existing VMs into VM Service
  24. Import Multiple VMs into VM Service Using ImportOperationBatch