Since October 27, 2026, Google Cloud offers two generally available ways to run VMware workloads. In Google Cloud VMware Engine, Google runs vSphere, vSAN, NSX and HCX together with the networking and physical infrastructure. In VMware solution on Google Cloud, the customer deploys and operates VMware Cloud Foundation on dedicated bare-metal Compute Engine nodes in its own VPC network12. VMware solution is bring your own license by design1, and new VMware Engine capacity has been sold without VCF licenses since October 15, 20253. The on-premises baseline is VCF 9.1.1 with the October 12, 2026, patches, which bring VCF Installer and SDDC Manager to 9.1.1.02004.
VMware Engine runs vSphere 8.0 Update 3 with HCX 4.11.456, a VCF 9.1 site needs HCX 9.x (KB 450437), and KB 427904 calls 4.11.x to 9.x pairs unsupported. VMware solution runs VCF 9.1 behind a Layer 2 allowlist, Compute Engine quota and Google-qualified ESXi images78910. Our recommendation is to pick the model by who will run the stack and to hold production moves until the closing checklist is met.
Licensing and operating model are separate questions
Google’s notice of October 3, 2025, allowed license-included VMware Engine capacity to be renewed or extended until October 15, 2025. After October 15, 2025, Google stopped selling license-included nodes, and new capacity uses BYOL nodes with a VCF subscription bought from Broadcom3. The notice covers sales and renewals, not the license-included nodes already in service. Google’s October 31, 2025, announcement enforces VCF portable licenses from November 1, 2025, by capping on-demand use: each project’s quota per region was set to its current usage, zero where it had none. Expanding with CUDs bought on or before October 15, 2025, takes a quota increase request that Google reviews in three days6.
Keys are registered per Cloud Billing account, not per project, with an attestation that they comply with the customer’s Broadcom agreement, and the console does not validate them in real time against Broadcom’s systems. The subscription covers node core capacity. Infrastructure, storage and backups, IP addresses, outbound data transfer and third-party add-ons stay outside it11.
Google’s model comparison page reads differently: it still describes VMware licenses as included with the managed service and lists bring your own license only for VMware solution1. Our recommendation is to plan new capacity on either model as BYOL, to request quota for the target region early, and to get written confirmation of how each existing license-included private cloud is treated.
Who does what in each model
In VMware Engine, Google keeps full administrative access, and the customer works through the CloudOwner account with rights to deploy and manage VMs12. Identity sources and user management go through solution user accounts with vSphere administrator privileges, and VMware Engine reverts forbidden actions taken with them, although some, such as deleting management VMs, are irreversible13. Google’s operations team runs the VMware updates as rolling maintenance, with vCenter unavailable for up to 60 minutes, 30% free storage expected beforehand and a window that can be moved in the Update center6. A failed node is replaced automatically14.
In VMware solution, Google runs the facilities, the bare-metal hardware and the underlying network, provides qualified ESXi images and repairs hardware, while the customer configures its VPC subnets, firewall rules and DNS zones. The customer, with root and administrator access in SDDC Manager and vCenter1, deploys vCenter, SDDC Manager, vSAN and NSX and plans and applies every VCF patch, update and upgrade, but only to ESXi versions that Google has qualified on the hardware and announced in its release notes. Google holds no VCF credentials, so identity, role-based access, passwords and certificates inside VCF are the customer’s, as is IAM for the Google Cloud resources9.
Host maintenance becomes a joint procedure. Google announces a maintenance event with a deadline, and the customer evacuates the host in vSphere and starts the event in its own change window. At the deadline Compute Engine starts it anyway and reboots the host without vSphere maintenance mode. Google estimates 120 to 150 minutes per event and asks for one node per cluster at a time15. Support splits the same way: Cloud Customer Care for the bare metal and VPC networking, Broadcom Support for the VCF stack under the portable entitlement, and either one when the cause is unclear16.
Designing a VMware Engine private cloud
The ve2 hyperconverged types offer 64 to 128 vCPUs, counted as two threads per physical core, all with 2,048 GiB of memory and from 12.8 to 51.2 TB of raw storage14. A standard private cloud needs at least three nodes and grows to 32 nodes per cluster, 32 clusters and 128 nodes, and the single-node private cloud meant for pilot tests and proofs of concept has no SLA cover17.
vSAN must keep 20% free space for the SLA, and RAID-5 needs four nodes and RAID-6 six5. Capacity without compute comes from NFS v3 datastores on Filestore or Google Cloud NetApp Volumes in the same region. The volume needs delete protection, and a datastore cannot be mounted from another region18.
A standard VMware Engine network is global and reaches a customer VPC through VPC Network Peering19. vSAN encryption is on by default with Google-managed keys. Customer-managed Cloud KMS keys for vSAN and vTPM became self-service on July 8, 2026, and an external KMS is the third option320. That key service supplies the key encryption key for vSAN20. Our recommendation is to put a customer-managed or external one in the recovery plan.
VMware solution on Google Cloud: what comes before the first node
Google states that VMware solution runs VCF 9.17. Its nodes are Compute Engine instances on Compute Engine quota, so VMware Engine’s region list and node quota do not apply10.
There is one machine type, a Z3 bare-metal instance with 192 vCPUs on 96 physical cores, 1,536 GiB of memory, 70.31 TiB of local NVMe and a 200 Gbps interface21. Under Broadcom’s VCF terms every physical core on the server is licensed, at least 16 per processor, so each node brings 96 cores into the subscription. A highly available VCF cluster needs at least four nodes of that type, and the nodes of a cluster in one zone must share a network endpoint group22. Stopping a node and starting it again, or deleting it, erases its local NVMe, so evacuation in vCenter comes first, and deletion protection is on by default21.
Fault isolation inside a zone comes from spread placement policies. A policy has one to eight availability domains on separate racks, switches and power, mapped one to one to vSAN fault domains. Google asks for one policy per cluster and recommends five to eight domains for growth and RAID-5 or RAID-6, and moving a node to another domain later erases its NVMe23.
The project must be on the Layer 2 networking allowlist, requested in a support case that names the project and the target region and zone. Until Support adds it, the Self-managed page in the console shows a warning banner and disables deployment8. The VPC MTU must be 8896 bytes before nodes are deployed, the management, vSAN, vMotion and NSX TEP subnets need ARP broadcast with MAC learning, and every node and appliance needs forward and reverse DNS8. Quota in the region and zone comes next and does not guarantee hardware, so Google asks large deployments to plan capacity with the account team1024. Broadcast subnets have documented limits of 64 NIC endpoints per subnet, 64 such subnets per VPC network and region, and 1,000 learned MAC addresses per VPC network10.
Management appliances sit on underlay VPC subnets behind regional internal load balancers that follow them between hosts, workloads run on NSX overlay segments, and north-south traffic uses static VPC routes to a floating VIP or eBGP from up to eight Tier-0 edges to Cloud Router7.
HA, DR and backup, failure by failure
For a failed host, VMware Engine adds a replacement node automatically14. In VMware solution, vSphere HA restarts the VMs after a host error and replacing the node is the customer’s job, so every cluster needs the spare compute and storage its vSAN policy requires915.
Zone loss is covered on VMware Engine, where offered, by stretched private clouds across two data zones and a witness zone in one region, with 3+3 to 16+16 data nodes, and the stretched type is fixed at creation25. Among the European regions, London, Frankfurt and Milan list stretched private clouds14. On VMware solution, placement policies spread a cluster across racks within one zone23, so a zone loss there is a recovery event rather than an HA event.
Region loss needs a second site. For VMware Engine, Google documents VMware Site Recovery Manager (SRM) with vSphere Replication, customer-licensed and at matching versions on both sides26, and JetStream, in preview since July 8, 20263. VMware Engine Protected bundles Google’s Backup and DR Service per node and can recover VMs across regions27. For VMware solution, Google lists NSX Federation for multi-site networking, security policy and recovery orchestration across VCF instances or regions28. Federation carries networks and policy, so replication and tested failback still need their own design, with the multi-site options for the platform and vSphere Replication with recovery plans for the workloads.
Workload backup is the customer’s in both models, since Google’s responsibility on VMware solution ends at the hypervisor929. Google’s Backup and DR Service and several VADP-based third-party products are validated for VMware Engine, with repositories on regional persistent disks, zonal Filestore or Cloud Storage30. Administrative compromise defeats any copy the platform administrators can delete. A deleted VMware Engine private cloud is kept for seven days, but Privileged Access Manager can speed up its final deletion3, so who holds that permission matters.
Moving workloads from a VCF 9.1 environment
VMware Engine’s component page lists ESXi 8.0 U3f, vCenter 8.0 U3e, NSX 4.2.2.1 and HCX 4.10.35. Later notices roll out HCX Manager 4.11.4 from June 24, 2026, and vCenter and ESXi 8.0 U3k from August 24, 20266. HCX Cloud Manager comes with every private cloud, and the on-premises connector must run the same version, on a vSphere version HCX supports for the chosen migration type31.
Broadcom’s pairing policy requires the same major HCX version on both sites, and the VCF 9.1 upgrade page states that appliances at 9.0 or later are not compatible with earlier versions and pairing breaks3233. KB 450437 adds that HCX 4.x, 4.11.x included, is incompatible with the vCenter 9.1 Envoy gateway and requires HCX Manager and every service mesh appliance at 9.1 or later before vCenter, and KB 427904 calls 4.10.x or 4.11.x pairs with 9.x unsupported. A VCF 9.1.1 site therefore has no supported HCX pair with VMware Engine, whose release notes and component page announce no HCX 935. Our recommendation is to ask Google in writing for an HCX 9 date before planning HCX waves, and meanwhile to treat restore from a backup product supported on both versions as the way in. On VMware solution both sites run VCF 9.1, so the customer can meet the policy with HCX 9 on both. Migration types, waves and rollback follow from there.
VM hardware comes next. KB 315655 maps hardware version 22 to ESX 9.0 and version 21 to ESXi 8.0 U2, so a VM upgraded to version 22 on premises cannot power on at VMware Engine’s 8.0 U3 hosts, and VMs that may move stay at version 21 or lower. A key provider on both sides for encrypted VMs and vTPM, backup tools for both versions, and failback, which repeats every check in reverse, complete the list.
Regions, costs and the choice
VMware Engine lists Doha and Dammam with ve2 nodes and Tel Aviv with ve1. In Europe it lists London, Frankfurt, the Netherlands, Milan and Paris with both families, Madrid with ve2, and Zurich and Turin with ve1 only, the generation Google is retiring. The node types page lists no region in the UAE314. For VMware solution, the Layer 2 support case and the quota check each name a region and zone824. Our recommendation is to put it on a project plan only once Google has confirmed both and the VCF release for that location. A team that can neither accept a Google-run 8.0 U3 stack nor run VCF lifecycle, backup and recovery itself fits neither documented model.
VMware Engine is billed per node, on demand or under a committed use discount (CUD) that cannot be canceled14. New CUDs are Portable License commitments, covering nodes only. Three-year terms exist only for post-paid ve2 commitments, those bought after May 31, 2026, all end on October 15, 2028, and Google applies three-year pricing regardless of the actual term34. VMware Engine Protected adds whole-VM backup at a fixed price per node, with backup storage billed separately27.
The customer-run model is built from Compute Engine resources: for each node a bare-metal instance with a 128 GB boot disk, plus one regional backend service per appliance VIP or NSX Edge endpoint, typically 15 to 20 per VCF instance10. The team that runs VCF lifecycle, backup and recovery is not in Google Cloud’s charges, and the VCF subscription stays a separate Broadcom contract in both models11.
Leaving VMware Engine means moving workloads out or restoring them from backup while any CUD runs to its end date14. On VMware solution, a node is decommissioned in SDDC Manager and vCenter before its Compute Engine instance is deleted22. Figure 3 puts the choice in order.
Some points remain open. The licensing notice gives no outcome for an existing license-included term when it ends, and Google announces neither VCF 9 nor HCX 9 for VMware Engine35. The VMware solution release notes show no ESXi qualification yet, and its pages list no supported VCF patch levels and name no HCX release, VM replication or backup product or design across zones27928.
Checklist and hold criteria for the first production wave
- License owner: VCF cores for every planned node, 96 per VMware solution node, plus the on-premises overlap, within the Broadcom entitlement. Evidence: the entitlement, the license plan and, for VMware Engine, the License Management dashboard11.
- Cloud architect, VMware Engine: node quota and the planned node family in the target region. Evidence: the approved quota request and the node types table614.
- Network engineer, VMware solution: the Layer 2 allowlist for the region and zone, MTU 8896, A and PTR records, and Z3 quota. Evidence: the support case confirmation, the console without the allowlist banner, the VPC MTU and subnet settings, DNS lookups for every node and the quota page810.
- Platform owner, VMware solution: the target VCF version offered in Google’s deployment workflow, which boots Google-provided ESXi images, and a qualified ESXi version before later upgrades. Evidence: the version selected for the zone and the qualification entry in Google’s release notes8924.
- Migration lead: a supported way to move VMs. Evidence: both HCX versions inside Broadcom’s policy32 and KB 427904, or a backup product whose vendor supports both versions and a test VM restored to the target and back.
- Platform engineer: on VMware Engine, every VM in the wave at hardware version 21 or lower, and on both models a key provider on each side for encrypted and vTPM VMs. Evidence: an inventory export checked against KB 315655 and one encrypted test VM moved.
- Backup owner: copies the platform administrators cannot delete, and the vSAN key service in the recovery plan. Evidence: a test restore and the list of who holds deletion rights, Privileged Access Manager included32030.
- Operations lead: on VMware Engine, 20% free vSAN and 30% before updates. On VMware solution, room to evacuate one node per cluster. Evidence: the capacity view and, for VMware solution, a rehearsed evacuation and return of one node5615.
Hold the wave if registered cores fall short, VMware Engine quota or the node family is missing, a VMware solution network item is open, the target VCF version is not offered or a planned upgrade has no qualified ESXi version, VMs have neither a supported HCX pair nor a tested restore path, a VM bound for VMware Engine runs hardware version 22 or later, an encrypted or vTPM VM has no key provider on the target, backup copies are deletable by the platform administrators or untested, the vSAN key service is missing from the recovery plan, free capacity is below those thresholds, or the node evacuation has not been rehearsed. The safe stopping point is a tested target with test VMs moved and back, and all production still on premises. Retry once the failed item has its evidence. For HCX that is a Google announcement of HCX 9 for VMware Engine or both versions inside Broadcom’s policy, and for ESXi the target version in the workflow or a qualification entry in Google’s release notes.
Sources
Show all 34 sources
- Compare VMware Engine models
- VMware solution on Google Cloud release notes
- Google Cloud VMware Engine release notes
- VCF Installer / SDDC Manager 9.1.1.0200 Release Notes
- Private cloud VMware components
- Latest service announcements
- Architecture overview
- Prerequisites
- Shared responsibility model
- Quotas and limits
- License management
- Private cloud vSphere permission model
- Elevate VMware Engine privileges
- VMware Engine node types
- Manage bare-metal node maintenance
- Get support
- About VMware Engine private clouds
- NFS Datastores overview
- About VMware Engine networks
- About vSAN encryption
- Bare-metal nodes and machine types
- About vSphere clusters
- Placement policies and availability domains
- Deploy nodes and configure appliance networking by using the console
- VMware Engine stretched private clouds
- Configure disaster recovery using VMware SRM
- VMware Engine Protected offering
- VMware Cloud Foundation components and networking
- Data protection recommendations
- Workload VM backup solutions
- Use VMware HCX to migrate VMware VMs
- VCF Operations HCX Pairing Interoperability Policy
- Upgrading to VMware Cloud Foundation 9.1.x
- Committed use discounts