Skip to content

A certification home lab for VCF and vSphere Foundation 9: what to build and what to test

What to build for a VCP exam comes from its published objective list. The current guides, all November 2026 editions, are still named for 9.0: VCP-VCF Administrator (2V0-17.25) and VCP-VCF Architect (2V0-13.25)12, and VCP-VVF Administrator (2V0-16.25) and VCP-VVF Support (2V0-18.25)34. The current release is 9.1.1, with the October 12, 2026, patches, ESX and vCenter 9.1.1.010056. Both paths, including the 9.1 renames, are covered in VCF 9 certification paths and VVF 9 certification paths.

Which lab each exam needs

The verbs in the guides decide how much to build. In the VCP-VCF Administrator guide, the deployment of a workload domain is something to describe, while workload domain storage, a Supervisor within a workload domain and the VCF Network Gateway are things to configure (the gateway’s deployment also to describe), and the vCenter import objective asks candidates to identify the tasks and processes it requires1. The VCP-VCF Architect guide has no testable objectives in its Deploy, Configure, and Operate section2. The VCP-VVF Administrator guide expects a deployed vSphere Foundation with a Supervisor, VCF Operations and VCF Operations for logs3, and the VCP-VVF Support guide tests only troubleshooting, from the initial deployment to VCF Operations Orchestrator workflows4.

Our recommendation is one lab per product family, sized from the documented floors in the sections below:

  • VCP-VCF Administrator: a management domain from the VCF Installer’s Simple profile, a workload domain on NFS v3 with a Supervisor, and a small vCenter to import. The single-host option of the 9.1.1 Installer can stand in for the first deployment only.
  • VCP-VCF Architect: no new build. The design tests run on the Administrator lab, or on paper.
  • VCP-VVF Administrator: vSphere Foundation deployed by the Installer with its management services, plus log management and a Supervisor with Foundation Load Balancer.
  • VCP-VVF Support: the same lab, plus iSCSI and NFS targets, a stretched or two-node vSAN cluster with its witness on a physical host, and a plain vSphere environment to convert or import.
  • For operating and consuming objectives on either track: Hands-on Labs, which need none of this hardware but do not cover deployment.

What Broadcom documents for any lab

Nested ESX is the first decision. KB 313547 says Broadcom does not support ESX nested in a virtual machine in production environments, on ESX, Workstation, Fusion or a third-party hypervisor, and unsupported configurations fall outside its support and service level agreements. The same KB encourages VMware Certified Professionals to use nesting to learn the products, test configurations and conduct training. Its known working but unsupported combinations for ESX 9.0 are a host running ESXi 8.0 or later, or Workstation and Fusion 25H2 or later, and it warns that nesting may require additional licenses. The vSAN Witness Appliance is the one supported nested ESX, and only as a VM on a physical ESX host.

Physical or nested, each ESX host has documented minimums. ESX 9.1 needs at least two CPU cores, 8 GB of RAM, the NX/XD bit enabled, hardware virtualization for 64-bit virtual machines, one Gigabit Ethernet controller, and a persistent boot device of at least 32 GB, with 128 GB recommended for new servers. USB and SD boot devices, and boot devices under 32 GB, are deprecated starting with 9.1 and will be removed in the next major release7. ESX and vCenter belong to both products in the 9.1.1 Bill of Materials8, so the ESX section of the 9.1 product support notes applies to both tracks. One deprecation hits home labs directly: the Marvell/Aquantia (Atlantic) NIC drivers, described as commonly used in home labs for 10GbE over USB and PCIe, are deprecated and will be removed in a future release9.

Licensing has two documented routes. After installation, ESX, vCenter and VCF Operations run in evaluation mode for up to 90 days, and for ESX the clock starts at first boot, not when the host joins vCenter. When the period ends without a license, management operations are prevented, hosts disconnect from vCenter and workloads cannot be started. An expired vCenter or ESX evaluation is recovered by assigning a valid license, but a VCF fleet whose evaluation has expired cannot be licensed and must be reinstalled. The page covers VCF and vSphere Foundation alike10. For the second route, Broadcom’s VCF blog of April 14, 2025, says that passing VCP-VVF Administrator or one of the VCP-VCF Administrator, Architect and Support exams gives access to a one-year, 32-core, personal-use vSphere Standard license through the Broadcom Certification License Portal, and that VMUG Advantage members who pass one of the three VCP-VCF exams can get personal-use VCF licenses for up to three years11. Confirm the current terms in the portal before relying on them. For a first exam, evaluation is the documented route, which makes the 90 days a project deadline.

The VCF Administrator lab

The VCF Installer’s smallest profile for the first VCF Instance, Simple, deploys VCF management services with one control plane node and two worker nodes, SDDC Manager, a Small vCenter, a Medium NSX Manager, a Small VCF Operations, the license server, a cloud proxy and a Small VCF Automation, and Broadcom puts its resource requirement at 76 vCPU, 251 GB of RAM and 7,448 GB of disk. Log management, which the log objectives need, is an optional day-2 deployment. Its Small size upscales each worker node from the Medium form factor (12 vCPU, 24 GB) to Large (16 vCPU, 32 GB), and the worker count can grow with the replica count, so 251 GB is a floor rather than a total12. With vSAN, the default management cluster in the Simple model needs at least three hosts and reserves 33 percent of CPU and memory for one host failure. On NFS or Fibre Channel the minimum is two hosts with a 50 percent reserve13. Each vSAN ESA host needs at least 128 GB of memory and at least one NVMe TLC device in its storage pool14. Across three hosts with one held in reserve, the management footprint alone is about 126 GB of RAM per host, before ESX and vSAN take their share. In a nested lab, the physical hosts carry all of that plus the nested ESX VMs. Broadcom’s VCF blog of October 13, 2026, says the 9.1.1 VCF Installer UI now offers a single ESX host deployment for labs and proofs of concept, while production deployments must still meet the published host minimums to stay supported15. Our recommendation is to use it for the first deployment and the operating tests, and to build the multi-host layout for the reserve, workload domain and Architect tests, which one host cannot show. The blog does not say whether a single-host deployment can be expanded, so plan a redeploy: reinstalled ESX hosts start a new 90-day evaluation from first boot10.

Simple profile resources and management cluster minimumsThe first VCF Instance’s Simple profile requires 76 vCPU, 251 GB RAM and 7,448 GB disk. The default management cluster needs at least three hosts with vSAN or two with NFS or Fibre Channel. CPU and memory reserves for one host failure are 33 percent and 50 percent respectively. With three vSAN hosts and one reserved, the management footprint is about 126 GB RAM per host before ESX and vSAN. The vSAN ESA minimum is 128 GB RAM per host.First VCF Instance: Simple76 vCPU · 251 GB RAM · 7,448 GB diskDefault management clustervSANNFS or Fibre ChannelAt least 3 hostsAt least 2 hostsCPU and memory reservesfor one host failure33% reserve50% reservevSAN: 3 hosts,1 held in reserveManagement footprintAbout 126 GB RAM per hostbefore ESX and vSANvSAN ESA minimum128 GB RAM per host Simple profile resources and management cluster minimumsThe first VCF Instance’s Simple profile requires 76 vCPU, 251 GB RAM and 7,448 GB disk. The default management cluster needs at least three hosts with vSAN or two with NFS or Fibre Channel. CPU and memory reserves for one host failure are 33 percent and 50 percent respectively. With three vSAN hosts and one reserved, the management footprint is about 126 GB RAM per host before ESX and vSAN. The vSAN ESA minimum is 128 GB RAM per host.First VCF Instance:Simple76 vCPU · 251 GB RAM7,448 GB diskDefault managementclustervSANNFS orFibre ChannelAt least3 hostsAt least2 hostsCPU and memory reservesfor one host failure33% reserve50% reservevSAN: 3 hosts,1 held in reserveManagement footprintAbout 126 GB RAM per hostbefore ESX and vSANvSAN ESA minimum128 GB RAM per host
Figure 1. Simple profile resources and default management cluster minimums, with storage-specific reserves and the three-host vSAN memory calculation.

The workload domain objectives need a second set of hosts: at least three for a workload domain cluster on vSAN, or two on NFS or Fibre Channel13. Our recommendation is NFS v3 for the lab’s workload domain. It saves a host and gives the storage objective a principal storage type different from the management domain, at the cost of leaving vSAN in a workload domain untested. The lab then needs a second NFS v3 export, because VCF 9.1 supports no cross-type primary datastore change other than vVol to vSAN, so a primary datastore test on an NFS cluster has to move to another NFS datastore, with the workloads migrated to it first16.

The import objective needs a third, small environment: a vCenter with its own cluster, built outside VCF. The import page sets the conditions: a datastore shared, accessible and writable by every host in the cluster, a vSphere Distributed Switch, clusters on vSphere Lifecycle Manager images with fully automated DRS, static VMkernel addresses, and forward and reverse DNS. All clusters of that vCenter are imported together. A vCenter at 9.0 or later without NSX lets the import deploy a single-node NSX Manager instead of three nodes, a 9.1 NSX Manager, shared or new, needs that vCenter at 9.1 first, and a vCenter on its own cluster gets the NSX Manager appliances there17. Our recommendation is to build that environment at 9.1.1 and choose the single node.

The tests follow the statements: deploy both domains, configure identity and roles, rotate a certificate and a password, license before day 90, import the separate vCenter, build a view, report, dashboard and alert in VCF Operations, reconcile one drift change, then create a VCF Automation region and organization with provider networking and a content library, and work in it as the organization administrator1. Figure 3 adds the role and evidence for each test.

The VCF Architect exam as a design lab

The Architect guide’s section 1 asks candidates to relate design decisions to requirements, state their implications and develop a design validation strategy, and section 3 covers availability within and across availability zones, lifecycle, scalability, capacity, recoverability and workload migration2. The single-rack cluster model gives two decisions to verify, the 33 percent reserve of a three-host vSAN cluster and the 25 percent reserve of four hosts in the High Availability model13. Our recommendation is to compare the Simple profile’s 76 vCPU and 251 GB with the 106 vCPU and 335 GB of High Availability Small12. Patching the lab to the October 12, 2026, ESX and vCenter builds56 is the lifecycle exercise.

Configuration drift gives a third test. VCF 9.1 lists changes that can be made directly in vCenter without affecting SDDC Manager, among them distributed switch changes and a change of primary datastore, and a sync workflow reconciles the rest. Its out-of-band storage workflows apply only to clusters created in SDDC Manager, and imported or converted clusters use the sync operation in VCF Operations16. Our recommendation is one change on the created workload domain and one on the imported domain, recording what SDDC Manager shows. The recoverability test comes from VCF 9.1 management backup and restore.

The vSphere Foundation lab

The VCP-VVF Administrator objectives need content libraries, securing workloads and infrastructure with encryption, vSAN ESA or OSA with storage policies, a Supervisor configured within a cluster, and VCF Operations with VCF Operations for logs for views, reports, dashboards, alerting, log exploration, costing and service discovery. Objective 2.5 has four VKS statements, all asking candidates to describe: Supervisor concepts, infrastructure components and security, its deployment models, networking and storage, its core and optional services, and VKS deployment and administration. Supervisor-based services and the VCF Operations Orchestrator use case are also describe-level3. The Support objectives add a vSphere to vSphere Foundation conversion, the import of an existing vSphere environment as a cluster, adding and removing hosts and clusters, license assignment and expiry, vSAN stretched clusters, iSCSI, NFS and Fibre Channel storage, distributed and standard switches, the Observability Workbench, a log bundle uploaded through log assist, and Orchestrator configuration and workflows4.

The VCF Installer deploys vSphere Foundation only together with the VCF management services, in a simple mode with a Medium vCenter, a Medium VCF Operations and Small management services, on vSAN ESA or OSA, VMFS on Fibre Channel or NFS v318. A Medium vCenter takes 8 vCPU and 30 GB of memory19. Without the management services, vSphere Foundation 9.1 is deployed manually, without the Installer, which is supported but gives up log management, the software depot and integrated lifecycle of VCF Operations. The services can be added later with the Installer, and log management is then deployed from VCF Operations20. The log objectives need both. The wizard option to auto-claim vSAN ESA disks that the Installer cannot check against the compatibility list is only for hardware already verified as certified, so it is no shortcut for unlisted lab disks. For the conversion objective, the page points to a separate procedure that converges an existing vCenter and its hosts to vSphere Foundation18.

Broadcom supports the Supervisor with VDS networking and Foundation Load Balancer on vSphere Foundation. Each cluster needs three ESX hosts without vSAN, or four with vSAN and at least two physical NICs, each host at least 8 CPUs and 64 GB of memory, DRS fully automated and HA enabled, and lowercase host names, or activation might fail. The Small load balancer size, 2 vCPU and 4 GB, is for proofs of concept only, and an active-passive pair needs twice the footprint21. With vSAN ESA, which vSphere Foundation includes, the 128 GB minimum per host applies too1422. The storage objectives need iSCSI and NFS targets the hosts can mount, Fibre Channel if the hardware exists, and a stretched cluster. vSphere Foundation includes vSAN stretched and two-node clusters22, and their witness appliance is the nested ESX that KB 313547 supports, on a physical ESX host. Conversion and import need a separate plain vSphere environment. VCF Operations Orchestrator, which the Support objectives use, is included with vSphere Foundation and works without VCF Automation22.

The tests again follow the statements: an encrypted VM for the workload side of the encryption objective, vSAN policies with different resilience settings and their space efficiency, a Supervisor configured on a cluster, with the describe-level statements studied on it, log exploration and costing3. For the Support objectives, our recommendation is to break one thing at a time in each listed area and fix it with the tools the guide names4. Figure 3 includes this track.

Some tests must stay on paper. Letting evaluation run out to rehearse the expiry objective disconnects all hosts of the vCenter, and recovery needs a valid license10. Our recommendation is to learn the documented behavior and to license or rebuild the lab before day 90. Fibre Channel without HBAs and a fabric is the same case, learned from the documentation and noted in the worksheet.

Hands-on Labs beside your own lab

Broadcom’s VMware Hands-on Labs are free, run in a browser and need no installation, licenses or special hardware23. Browsing the catalog needs no account, but enrolling needs a login. Every lab named below lists a time limit of 1 hour 30 minutes within a valid period of 2 hours, and most can be repeated as often as needed24.

Figure 2 maps current 9.1 labs, by exact catalog title and code, to exam objectives1234, leaving out retired labs24. No lab names vSphere Foundation, so its rows use labs on its components, the Supervisor, vSAN and VCF Operations3.

Track
Objectives
Hands-on Labs (catalog title and code)
VCF Administrator
Objectives: Passwords, certificates, identity, lifecycle
Hands-on Labs (catalog title and code): Mastering the VCF Lifecycle: From Deployment to Operations (HOL-2704-01-VCF-L), modules on password management, certificate management, SSO and identity provider, and software depot and lifecycle management
VCF Administrator
Objectives: Networking, connectivity and routing
Hands-on Labs (catalog title and code): Advanced Networking in VMware Cloud Foundation 9.1 (HOL-2705-02-VCF-L)
VCF Administrator
Objectives: Network operations
Hands-on Labs (catalog title and code): VCF Operations for Networks: Visibility, Troubleshooting & Assurance (HOL-2711-10-VCF-L)
VCF and vSphere Foundation Administrator
Objectives: Views, reports, dashboards
Hands-on Labs (catalog title and code): Getting Started with VCF Operations 9.1 (HOL-2711-02-VCF-L)
Visualizing the Private Cloud using Views, Dashboards and Reports in VCF Operations (HOL-2711-04-VCF-L)
VCF and vSphere Foundation Administrator
Objectives: vSAN, encryption and storage monitoring
Hands-on Labs (catalog title and code): VMware vSAN 9.1 – Getting Started and Advanced Topics (HOL-2734-01-VCF-L), including modules on vSAN encryption and stretched clusters
Monitoring Storage using VCF Operations (HOL-2711-11-VCF-L)
VCF and vSphere Foundation Administrator
Objectives: Supervisor and VKS
Hands-on Labs (catalog title and code): Hands-On with Kubernetes: Deep Dive With the vSphere Kubernetes Service 3.6 (HOL-2704-07-VCF-L)
VCF Administrator
Objectives: VCF Automation
Hands-on Labs (catalog title and code): Getting Started with Automation on VMware Cloud Foundation 9.1 (HOL-2711-21-VCF-L)
Provider Management and Administration in VCF Automation (HOL-2711-22-VCF-L)
VCF Architect
Objectives: Background for workload migration and disaster recovery decisions
Hands-on Labs (catalog title and code): VMware Cloud Foundation 9.1 – Operations Workload Mobility (HCX) (HOL-2705-03-VCF-L)
VMware Data Protection: Disaster Recovery Use Case (HOL-2734-03-VCF-L)
vSphere Foundation Administrator
Objectives: Log events, costing, service discovery
Hands-on Labs (catalog title and code): Mastering Log Event Monitoring in VCF Operations (HOL-2711-15-VCF-L)
Understanding Cost Monitoring, Optimization, Showback and Chargeback (HOL-2711-09-VCF-L)
Monitoring Modern Apps, Traditional Applications, Operating Systems and Services with VCF Operations (HOL-2711-07-VCF-L)
vSphere Foundation Support
Objectives: Observability Workbench, log assist
Hands-on Labs (catalog title and code): Troubleshooting Workloads and Infrastructure in the VCF Private Cloud (HOL-2711-06-VCF-L), which works through the Troubleshooting Workbench
Monitoring Private Cloud infrastructure with VCF Health and Diagnostics (HOL-2711-03-VCF-L), log assist as a recorded walkthrough
Figure 2. Current 9.1 Hands-on Labs by exact catalog title and code, mapped to the exam objectives they support.

Deployment is the gap. The description of Planning and Executing the Transition to VCF 9.1 (HOL-2704-05-VCF-S) states that installing, upgrading or migrating VCF does not fit within the lab time, so that lab has no nested environment, no live installer and no change you can apply. Its modules, importing a vCenter as a workload domain among them, describe the level of effort instead24. Our recommendation for both tracks is to use the labs while your lab is built or rebuilt, and to keep the deploy, import, drift and break-and-fix tests for it.

Stopping points and evidence

Our recommendation is one worksheet per track, with a row per objective statement in its own wording: the component, the test, the expected result from the documentation, the observed result and the date. The Architect guide’s decision wording2 matches the design library’s requirement, justification and implication format13, so the design tests can share the columns. A row with no observed result marks what to cover by reading.

Broadcom documents one stopping point that cannot be undone, for a VCF fleet: still in evaluation on day 90, it cannot be licensed and must be reinstalled. For vCenter, ESX and VCF Operations the same page gives recovery by assigning a license, and it does not say whether vSphere Foundation with management services counts as a fleet10. Our recommendation is to treat both tracks as if the reinstall rule applied, to write the rebuild date into the worksheet on day one, and to use the hold criteria and retry evidence in Figure 3.

Test and role
Hold criteria and retry evidence
Evidence to keep
Any new test, both tracks
Hold until the remaining evaluation days cover the test and a rebuild. Retry evidence: a license assigned, or a new rebuild date
VCP-VCF Administrator: deploy and configure
Test and role: Installer operator. Management domain with the Simple profile, then a workload domain on NFS v3 with a Supervisor
Hold criteria and retry evidence: Hold the workload domain and Supervisor until the management domain deployment has completed. Retry evidence: the failed task, its cause and the corrected input
Evidence to keep: Completed deployments, NFS v3 as the workload domain’s principal storage, a running Supervisor
VCP-VCF Administrator: manage
Test and role: VCF administrator. Identity and a role, one certificate and one password rotated, the license assigned, the separate vCenter imported
Hold criteria and retry evidence: Hold the import until the separate vCenter meets every condition on the import page. Retry evidence: the failed condition, shown as met
Evidence to keep: Old and new certificate dates, the license date before day 90, the imported workload domain
VCP-VCF Administrator: operate
Test and role: VCF Operations administrator. A view, report, dashboard and alert, log events, one drift change and a sync
Hold criteria and retry evidence: Hold the drift test until the import is complete, a second NFS v3 export exists and the workloads are on it. Retry evidence: the workloads on the target datastore and the failed sync’s cause, fixed
Evidence to keep: Saved content, an alert that fired, the inventory before and after the sync
VCP-VCF Administrator: consume and automate
Test and role: Provider administrator, then organization administrator. A region, an organization, provider networking, a content library
Hold criteria and retry evidence: Hold the region and organization until VCF Automation from the Simple deployment is running. Retry evidence: the failed step and the corrected provider networking or content input
Evidence to keep: An organization its administrator can work in
VCP-VCF Architect: design lab
Test and role: Designer. HA reserve at three and four hosts, Simple against High Availability Small, patching, drift, backup and restore
Hold criteria and retry evidence: Drift follows the operate row above, patching the patch exercise row below
Evidence to keep: Requirement, implication and observed result for each decision
VCP-VVF Administrator: fundamentals
Test and role: vSphere administrator. A content library, an encrypted VM, vSAN policies with different resilience settings and their space efficiency
Hold criteria and retry evidence: Every-test gate only
Evidence to keep: Library items, the encrypted VM, policy compliance and space efficiency per policy
VCP-VVF Administrator: deploy and consume
Test and role: Installer operator, then vSphere administrator. Management services, a Supervisor with Foundation Load Balancer configured on a cluster, its core and optional services studied for the VKS statements
Hold criteria and retry evidence: Hold the Supervisor with Foundation Load Balancer until each cluster meets the host count, two physical NICs with vSAN, 8 CPUs and 64 GB per host, fully automated DRS, HA and lowercase host names. Retry evidence: the failed requirement, shown as met
Evidence to keep: Completed deployment, a running Supervisor, notes against each VKS statement
VCP-VVF Administrator: operate
Test and role: VCF Operations administrator. Log management, views, reports, dashboards, alerts, log exploration, costing
Hold criteria and retry evidence: Every-test gate only
Evidence to keep: Saved content, a log query, a costing result
VCP-VVF Support: storage
Test and role: Support engineer. iSCSI and NFS targets, stretched or two-node vSAN with the witness on a physical host, one fault at a time
Hold criteria and retry evidence: Every-test gate only
Evidence to keep: Symptom, cause and fix for each fault
VCP-VVF Support: clusters
Test and role: Support engineer. Convert or import a plain vSphere environment, add and remove hosts and clusters
Hold criteria and retry evidence: Hold conversion or import until a plain vSphere environment exists apart from the vSphere Foundation lab. Retry evidence: the failed precheck and its corrected setting
Evidence to keep: The converted or imported cluster, each failure and its fix
VCP-VVF Support: tools
Test and role: Support engineer. VCF Operations Orchestrator, the Observability Workbench, a log bundle for log assist, a workflow run
Hold criteria and retry evidence: Every-test gate only
Evidence to keep: A Workbench finding, the bundle, the workflow run
VCP-VVF Support: licenses
Test and role: Support engineer. Assignment in the lab, expiry on paper only
Hold criteria and retry evidence: Every-test gate only
Evidence to keep: Lab licensed or rebuilt before day 90
Patch exercise, both tracks
Hold until the target builds are named and a management backup exists. Retry evidence: a current backup and the cause of the failed step
Figure 3. Our checklist for the VCP-VCF and VCP-VVF tests: the role that runs each one, when to hold it and what a retry needs, and the evidence to keep.

Some points stay open. The pages checked do not say whether the personal-use vSphere Standard license covers VCF Operations and log management, or whether 9.0 binaries remain available for a lab that matches the exam version. Objectives on 9.0 deployment options and cluster components, such as those of VCF Operations for logs, are safer learned from the 9.0 documentation. The single-host blog gives no resource or storage requirements and no expansion path, Broadcom gives no supported minimum for a nested lab, and the KB list of working combinations stops at ESX 9.0.

Our recommendation is to start by counting hosts and memory against the floors above and the 90-day evaluation window, then pick physical or nested hardware. If the count does not fit, cut the import environment before the workload domain: three VCP-VCF Administrator statements need the workload domain, while the import statement asks only for the tasks and processes, which the import module of HOL-2704-05-VCF-S describes.

Sources

Show all 24 sources
  1. VMware Cloud Foundation 9.0 Administrator (2V0-17.25)
  2. VMware Cloud Foundation 9.0 Architect (2V0-13.25)
  3. VMware vSphere Foundation 9.0 Administrator (2V0-16.25)
  4. VMware vSphere Foundation 9.0 Support (2V0-18.25)
  5. ESX 9.1.1.0100 Release Notes
  6. vCenter 9.1.1.0100 Release Notes
  7. ESX Hardware Requirements
  8. Bill of Materials 9.1.1
  9. Product Support Notes
  10. Licensing Model
  11. Free Home-Lab Licenses for VMware Certified Professionals
  12. VCF Fleet Sizing Models
  13. Single-Rack vSphere Cluster Model
  14. Hardware Requirements for vSAN
  15. Customer Favorite Capabilities: Accelerating Your Path to VCF 9.1.1
  16. Configuration Drift and Out-of-Band Operations in VMware Cloud Foundation
  17. Import an Existing vCenter to Create a Workload Domain
  18. Start a New vSphere Foundation Deployment by Using the VCF Installer Deployment Wizard
  19. Hardware Requirements for the vCenter Appliance
  20. Deploying VMware vSphere Foundation 9.1 Without VCF Management Services
  21. Requirements for Deploying vSphere Supervisor with Foundation Load Balancer
  22. VMware Cloud Foundation 9.1.1 and VMware vSphere Foundation 9.1.1: Feature Comparison & Upgrade Paths
  23. VMware Hands-on Labs
  24. Course Catalog – VMware Lab Platform